www.geyserwise.co.za
17
PV System Installers Guide
______________
Installation of the element
www.geyserwise.co.za
Ensure that you insert the
geyser temperature probe into the
correct pocket.
Insert the new geyser temperature
probe and connect the live wires once
again on the connector terminal block.
The blue and white wires on the AC/DC
element is the DC connection. The white
wire is connected to the negative of the PV
panel in case a solid state relay is used or
the negative of the MPPT in case a MPPT
controller is used. The blue wire is
connected to the negative of the load side
of the solid state relay in case a MPPT
controller is used or the negative of the
MPPT controller in case the MPPT controller
is used. Please see diagrammes on page 5.
3
4
5
Push the plug connected to the
geyser temperature probe through
the hole as provided on the geyser.
Plug it into the dedicated plug as
provided on the control unit.
6
Black and red = 230V AC
Blue and white = DC
8
GeyerWise Dual Controller
Instruction
manual
Plug the DC part of the element
into the MPPT Connector Cable
as supplied
5
6