14
Mounting of Parker bath
Final placement
•
Before lifting Parker bath out from the
pallet
Prior to moving the bath into its final position,
check:
•
Water service, stop and mixing valves,
lines, spout etc.
•
House drain system ready for hook-up.
•
Provision is made for electrical service to
interior junction box.
•
Move the Parker bath from the pallet
•
1. For safe lifting and moving of the bath tub,
it’s recommended to use four straps
(not included in delivery). Fasten one strap
around each foot of
Parker
bath.
(Figure 1.)
2. Some
Parker
baths have an optional base
added on top of the legs. Lift the base up to
access the legs. Steps 5-7 are not applicable.
•
•
3. Let four people (two on each side of the tub)
each grab a strap and lift
Parker
bath out
from the pallet. Move the tub to it’s the
intended place.
(Figure 2.)
•xx
4. Turn the nut on each foot to adjust the
Parker
bath height and lock it into its posi-
tion. Make sure that the
Parker
bath is lev-
elled horizontally and ensure that the bath is
stable.
(Figure 3.)
5. Place each foot cover over the screw of the
bath leg. The two larger foot covers are for
the legs on the head end of the bath. Each
foot cover have tracks for both left and right
leg usage.
(Figure 4.)
•
6. The covers need to be aligned with the legs.
Mount each foot cover according to illustra-
tion.
(Figure 5.)
7. Tie each foot cover with a cable ties.
(Figure 6.)
WARNING
Before lifting the Parker bath check
the lifting weight to make sure it is in
accordance with local codes.
Head end
Foot end
Содержание Arjohuntleigh Parker
Страница 1: ...Parker Assembly and Installation Instructions with people in mind 06 AL 00_12GB 02 2016...
Страница 4: ...4 Intentionally left blank...
Страница 13: ...13 Intentionally left blank...
Страница 23: ...23 HOT COLD Red Blue 1 2...
Страница 32: ...32 Intentionally left blank...
Страница 33: ...33 Intentionally left blank...
Страница 34: ...34 Intentionally left blank...