6
3. OPERATION DESCRIPTION
3.1
INSTALLATION
1) Apart the wooden package. Avoid damaging the machine.
2) a) Loosing 4 screws at the end of masters
。
(Do not unscrew the sliding
shaft, leave inside the track).
b) Lift up the master (Step 1).
c) Sliding the master towards turntable, until the sliding shaft move into
locking position (Step 2).
d) Master is in position to be fully lifted and tighten all screws (Step 3).
1
..
2
..
3
..
Содержание GPPW-1500B
Страница 6: ...4 2 2 MACHINE DIMENSION ...
Страница 7: ...5 2 3 Machine Description ...
Страница 11: ...9 3 3 OPERATION OF CONTROL PANEL ...
Страница 19: ...17 ...
Страница 20: ...18 ...
Страница 22: ...20 ...
Страница 25: ...23 6 PART LIST 6 1 SEAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 ...
Страница 27: ...25 6 2 TOWER ...