8
3.2
REMINDER OF INSTALLATION
Please pay attention on:
Tower Installation
When installing the tower, the engineers must make sure all 4 screws are
properly installed underneath the tower. 1 by carriage side, and 3 by the
motor sides.
Motor Cover
After all the connections are complete, please carefully install the motor
cover to cover up all the wire connections and the motor on the base of the
machines.
Содержание GPPW-1500B
Страница 6: ...4 2 2 MACHINE DIMENSION ...
Страница 7: ...5 2 3 Machine Description ...
Страница 11: ...9 3 3 OPERATION OF CONTROL PANEL ...
Страница 19: ...17 ...
Страница 20: ...18 ...
Страница 22: ...20 ...
Страница 25: ...23 6 PART LIST 6 1 SEAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 ...
Страница 27: ...25 6 2 TOWER ...