25
Maintaining the equipment
Maintenance schedule
Interval
Component
Activity
2 months
Spindle
Move spindle by at least one complete stroke.
3 months
Stuffing box seal
Visually inspect to ensure tightness.
Retighten a leaky stuffing box, replace if necessary.
Connections
Body gasket
Positioning of spindle in
gland seal
Spindle
Visually inspect the following points:
Tightness
Cleanliness
Wear
Replace leaky or worn components.
Remove dirt.
Stem
Seat ring
Check that the equipment closes correctly when the
stem is in closed position by measuring the
temperature.
Replace leaky or worn components.
Spindle bearing
Grease with the recommended grease (see next
section) and a lint-free cloth.
Lubricating nipples on spindle
bearing (equipment with
rotating motor)
Apply the recommended grease (see next section).
12 months
Secure actuator fastening
Check that screws and bolts are secure.
Tighten loose screws to the specified torque.
You can find information on the required torques in
the actuator installation instructions.
36 months
Overall equipment
Check condition of inner parts.
Check condition of spindle actuator.
Replace faulty or worn components.
Replace stuffing box.
Replace body gasket and sealing ring before
assembly.
Содержание ZK 29
Страница 1: ...Control Valve ZK 29 Original Installation Instructions 810685 05 ...
Страница 10: ...10 The yoke is fitted with the following items No Designation 8 Spindle 9 Scale marking indicator 10 Scale ...
Страница 58: ...58 ...
Страница 59: ...59 ...