10
Examples of installation
NRG 26-21
Fig. 4
Protection tube (provided on site) for
installation inside the boiler
Fig. 5
Protection tube (provided on site) for
installation inside the boiler
Fig. 6
Protection tube (provided on site) for installation
inside the boiler and in combination with other
GESTRA equipment
2
20
DN 50
G ¾
∅
20
∅
20
≤
90°
c
9
6
7
8
0
a
e
f
DN 100
24.5 24,5
∅
20
G ¾
∅
20
≤
90°
≤
3000
1"
6
e
h
7
d
g
9
0
c
20
20
∅
20
≥
10
DN 50
G ¾
∅
20
≤
3000
9
6
7
0
a
e
f
≤
90°
≥
14
Fig. 7
External level pot
DN 20
DN 20
Centre distance
≤
20
G ¾
DN 20
≤
20
6
0
9
e
h
8
8
190