![Gerber XLp Скачать руководство пользователя страница 30](http://html1.mh-extra.com/html/gerber/xlp/xlp_installation-configuration-manual_2216301030.webp)
30
XLp Installation & Configuration, June 2010
Cartridge Alignment: Separation
1. Click the
Start Cartridge Separation Alignment
button to run
the Y Head calibration.
NOTE:
The plotter will begin printing.
2. Check the plot for the line and corresponding numeric value that
represents the best match of the two printed lines.
3. Add or subtract the numeric value from step 2 from the current
value.
4. Enter the numeric value from step 3 in the
Y Head Calibration
box.
5. Click
Apply
.
6. Repeat the calibration if required.
NOTE: The default value is 261 (2.61 cm or 26.1 mm) on XLp95
Содержание XLp
Страница 5: ...5 XLp Installation Configuration June 2010 Overview Technical Specifications...
Страница 17: ...17 XLp Installation Configuration June 2010 Software installation...
Страница 19: ...19 XLp Installation Configuration June 2010 Gerber Device Configuration Select this plotter type...
Страница 41: ...41 XLp Installation Configuration June 2010 Components left side...
Страница 42: ...42 XLp Installation Configuration June 2010 Components Operator Side...
Страница 43: ...43 XLp Installation Configuration June 2010 Questions...