3.5.4 SEAL THE NODES
Seal the Nodes using the instructions in Section 3.2.3.
Important!
Make sure the cover seals tightly and evenly.
WARNING:
Single-channel enclosure lids are square but are not symmetrical.
They are specifically oriented; improper installation could strip the threads and/
or allow moisture to enter the enclosure.
3.5.5 RECORD NODE AND SENSOR SERIAL NUMBERS
Record the serial numbers of the Nodes and of the sensors attached to the
Nodes.
For Multi-Channel Nodes, also note the channel to which each sensor has been
connected.
3.6
CELLULAR GATEWAY COMMISSIONING
For ease of setup, add all Nodes to the network before commissioning the
Supervisor.
Commissioning allows the cellular gateway to account for all of the Nodes in the
network. However, the cellular gateway cannot account for Nodes added to the
network after the commissioning process has been completed. Run the
commissioning process again whenever you have added new Nodes.
To commission the Cellular Gateway Supervisor, do the following:
1.
Display
in a Web browser.
19:
FIGURE 19:
Accessing the Cloud
2.
Click "
create user
".
3.
Enter your credentials and read/agree to the
terms of service
.
Содержание GeoNet 8900 Series
Страница 2: ......
Страница 4: ......
Страница 11: ...VII EQUATIONS EQUATION 1 3KΩ THERMISTOR RESISTANCE 29 EQUATION 2 10KΩ THERMISTOR RESISTANCE 30 ...
Страница 12: ...VIII ...
Страница 38: ...26 MODEL 8800 2 4B ADD ON MODULE GEOKON ...
Страница 52: ......
Страница 53: ......
Страница 54: ......
Страница 55: ......