Page 38/48
© Geobrugg AG, CH-8590 Romanshorn, Switzerland
GBE-100A-R / 08
Bending the vertical helix in an exceptional case
If the vertical helix
302
does not have a base on the terrain or on the concrete foundation
– e.g. the base plate of
the post protrudes above the foundation
210
– the helix may gradually unscrew
211
as a result of the mesh mov-
ing in the wind.
In this exceptional case to be prevented if possible, the vertical helix
302
must be hooked into the sec-
ond-last coil at the top end
212
.
210
302 / 211
212
302
Содержание GBE-100A-R
Страница 2: ...Page 2 48 Geobrugg AG CH 8590 Romanshorn Switzerland GBE 100A R 08...
Страница 3: ...Page 3 48 Geobrugg AG CH 8590 Romanshorn Switzerland GBE 100A R 08...
Страница 45: ...Page 45 48 Geobrugg AG CH 8590 Romanshorn Switzerland GBE 100A R 08...
Страница 46: ...Page 46 48 Geobrugg AG CH 8590 Romanshorn Switzerland GBE 100A R 08...
Страница 47: ...Page 47 48 Geobrugg AG CH 8590 Romanshorn Switzerland GBE 100A R 08...