background image

 

  

5

INSTALLATION

IMPORTANT!

The unit may only be used in connection with an electrical 

installation executed properly with grounding. It must also 

be ensured that the earth connection of the electrical 

installation is matched to the earth plug of the unit.

These instructions must be followed.

 If the installation is 

not executed in accordance with these instructions, KVM-

Genvex cannot be held liable for any further damage that is 

unrelated to the Genvex unit.

KVM-Genvex A/S always recommends careful planning of 

the installation space for your Genvex product in relation to 

the location of living spaces. As this is a technical product 

that contains fans and/or a heat pump, in rare cases, and in 

combination with inappropriate installation conditions, it 

may cause unsatisfactory noise or vibration nuisance. As a 

general rule, it is always recommended installing the 

technical system so that it is not located in the immediate 

vicinity of a bedroom. Furthermore, when securing the 

Genvex unit to the building structure, it is recommended 

attaching it to a heavy structural component such as 

concrete. It should also be ensured that no sound or vibra-

tions can be transmitted through materials in contact with 

the technical system. If there is a risk of propagation of 

noise and vibrations, further installation of vibration-

damping material and sound-damping of installation rooms 

are recommended.

Wall mounting (vertical connections)

Before starting the installation of the ventilation unit

Make sure that the wall used to hold the ventilation unit is 

built in such a way that it is able to support the weight of 

the unit. In addition, the wall must be straight and plumb.

1. Before attaching the mounting bracket to the wall, 

ensure that the bracket is in the correct position and 

that the necessary space and service conditions are 

available. Place the mounting bracket level and mark the 

positions of all 4 screw holes. 

2. Attach the bracket to the wall using screws in all 4 

mounting holes. 

3. Mount the ventilation unit by hanging it on the mounting 

bracket. The recess on the back of the unit is intended 

for this. 

Once the ventilation unit has been properly attached to the 

mounting bracket, lock the unit in place by inserting the 

locking screw into the locking hole. The supplied safety 

screws must be fully tightened!

Содержание ECO 360 R

Страница 1: ...INSTALLATION MANUAL ECO 360 R Mechanical ventilation with passive heat recovery A...

Страница 2: ...e system 12 Optimal initial commisioning of the system 12 System maintenance 13 Filters 13 Access to internal parts 14 Cleaning and inspection of rotary heat exchanger 15 Post heating surface 16 Fan 1...

Страница 3: ...guidance on using the appliance in a safe way and under stand the dangers involved Children must not play with the appliance Cleaning and user maintenance must not be performed by children without su...

Страница 4: ...g and reduced to a level necessary for efficient defrosting During defrosting an integrated modulating electric reheater ensures that the supply air temperature is maintained at an appropriate level T...

Страница 5: ...vy structural component such as concrete It should also be ensured that no sound or vibra tions can be transmitted through materials in contact with the technical system If there is a risk of propagat...

Страница 6: ...to the filter frame e g using elastic straps as shown in the picture below so that the filter is held in place and ensures 100 filtration Please note that this type of installation of the unit will r...

Страница 7: ...there must be a clearance of at least 600 mm in front of the ECO 360 R 5 5 34 600 600 596 4 131 131 143 2 282 200 160 3 4 1 2 Right hand version 1 Discharge air 2 Extract air 3 Outdoor air 4 Supply ai...

Страница 8: ...supply air to the right of the unit and a left hand version charac terised by the reheater being located in the supply air to the left of the unit It is possible to convert a right hand unit into a l...

Страница 9: ...e duct installation it is recommended using 4 x 160 mm nipple connectors with double sealing lips Alternatively a 200 mm spiro pipe can be used which is connected directly to the outside of the ECO 36...

Страница 10: ...grates should be placed on the north or east side of the house to achieve optimal comfort in homes flats It is recommended that the air intake should be located on the north or east side of the house...

Страница 11: ...rovided with 50 mm of insulation finished with alumini um foil Supply air and exhaust air ducts routed through heated rooms in the home do not need to be insulated unless cooling a bypass or a geother...

Страница 12: ...osition The intermediate valves are opened between 4 and 7 turns depending on how close they are to the unit 5 It is recommended setting the integrated post heating surface to a supply air temperature...

Страница 13: ...means that the filters must be replaced cleaned The system is stopped by removing the appliance connec tor from the ECO 360 R or at the socket The filter plugs are opened and the filter drawer is pull...

Страница 14: ...removed 1 Remove the screws from the front plate to access internal parts 2 Remove the protective plate covering the control board 3 Remove the 230V power cable and the control cable for the rotary ex...

Страница 15: ...ng brushes unscrew the strips as shown in the picture below New brushes are fitted and the strips screwed back on BE CAREFUL not to overtighten the screws for the brush strips Check that the drive bel...

Страница 16: ...do not use power tools to tighten the bolts as this may result in damage to the threaded connections Carefully tighten all the front plate bolts until the front plate is firmly seated on the housing...

Страница 17: ...ets in general Check gaskets on the unit and make sure they are intact 12 months Supply air and exhaust valves Check for dirt in supply air and exhaust valves Clean as needed Check that the valves hav...

Страница 18: ...l 21 071025 Converter 230V 24V DC 22 071069 Vibration damper 20x10 M6 PARTS LIST PART NUMBER STOCK NUMBER ITEM Gummifod 25x25 M6x18 068098 1 OPTIMA 270 Print 069875 2 IO print 069876 3 Samlet ventilat...

Страница 19: ...an Clogged supply air filter Outdoor air grille clogged with dirt and leaves in the autumn or snow and ice in the winter Fuse on control board has blown Unit is defrosting supply air fan runs at reduc...

Страница 20: ...utdoor air Sensor T1 Supply air Sensor T9 Option External stop EC fan Extract air Blue Yellow EC fan Supply air Blue Yellow EC fan Extract air 1x230V 50Hz Blue Yellow green Humidity sensor P1 EC fan S...

Страница 21: ...fan Supply air EC fan Extract air 1x230V 50Hz Black Blue Yellow green Humidity sensor P1 EC fan Supply air 1x230V 50Hz Control signal Rotor Modulating Reheating Modulating Preheating Potential free i...

Страница 22: ...2 4 6 8 10 12 14 0 5 10 15 20 25 30 Watt RPM Power consumption of display control board and rotor Heat and moisture recovery rotor according to 13141 7 0 10 20 30 40 50 60 70 80 90 100 1 3 5 10 15 20...

Страница 23: ...DE COMMISIONING INSTRUCTIONS The declaration of conformity can be downloaded from www genvex com For further information on dismantling components with a view to disposal and recycling see illustrati...

Страница 24: ...ilies At the same time our system is an important element when it comes to saving energy in homes and in society as a whole in fact you can recover up to 95 of the heat energy with a Genvex system All...

Отзывы: