27
Part 2- Mechanical Installation
1. Use the M5*20 hex screws to install the 65mm spindle holder on the Z-Axis Gantry Plate.
2. Insert the spindle motor or trim router into the spindle holder and tighten using the M5*20 hex screws.
Installing (OPTIONAL) the 65mm Spindle Holder
What you will need:
10
65mm Spindle Holder
41
(6) M5*12 Socket Cap Screw
45
(2) M5*20 Hex Screw
65mm Spindle Holder
or Trim Router
65mm Spindle Holder
M5*12 Socket Cap Screw
M5*20 Hex Screw
Note: The PROVerXL 6050 Plus comes with an extra 65mm spindle holder for installing bigger spindles or trim routers (Sold Seperately)
26
Allen Wrench
Содержание PROVerXL 6050 Plus
Страница 33: ...31 Part 3 Wiring Following the Wiring Diagram Below to connect the spindle cable RED RED BLACK BLACK...
Страница 35: ...33 Software Setup Install the driver software Driver CH340SER exe 1 Driver Installation...
Страница 38: ...36 Test Project...
Страница 41: ...39 Z Probe Setup Step 2 Probe commands filled in Grblcontrol Candle...
Страница 76: ...73 Software Installation Installieren Sie den Treiber software Driver CH340SER exe 1 Treiber Installation...