![Genmitsu PROVerXL 6050 Plus Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/genmitsu/proverxl-6050-plus/proverxl-6050-plus_user-manual_2213533014.webp)
12
Part 2- Mechanical Installation
6
Left Gantry Support
7
Right Gantry Support
Installing the Left and Right Gantry Support
The rear of the machine is
towards the stepper motor. Align
each Gantry support (Left) and
right to the corresponding holes.
Each support will be angled
towards the read of the machine
as shown in the photo below.
Use the M5*20 hex screws for
loose fit-up. Do not tighten
completely.
What you will need:
45
(8) M5*20 Hex Screw
Left Gantry
Support
Y-axis Beam
Right Gantry
Support
M5*20 Hex Screw
26
Allen Wrench
Содержание PROVerXL 6050 Plus
Страница 33: ...31 Part 3 Wiring Following the Wiring Diagram Below to connect the spindle cable RED RED BLACK BLACK...
Страница 35: ...33 Software Setup Install the driver software Driver CH340SER exe 1 Driver Installation...
Страница 38: ...36 Test Project...
Страница 41: ...39 Z Probe Setup Step 2 Probe commands filled in Grblcontrol Candle...
Страница 76: ...73 Software Installation Installieren Sie den Treiber software Driver CH340SER exe 1 Treiber Installation...