
First Edition • First Printing
Operator's Manual
Towing
Instructions
Part No. 1257653
Z-62/40 51
Towing Instructions
Using the Tow Package
Before Towing:
1
Position the machine on a level surface. Chock
the wheels to prevent the machine from rolling.
2
Attach the tow bar securely to the machine.
Attach the tow bar securely to the towing
vehicle.
3
Release the drive torque hubs by turning over
the drive hub disconnect caps.
4
4WD models: Release the front drive torque
hubs by turning over the drive disconnect
caps.
5
Turn the steering bypass valve
counterclockwise to hydraulically release the
steering.
Do not exceed recommended
maximum towing speed or
maximum towing times.
Maximum tow speed
12.87 km/h
Maximum towing time at 13 km/h
30 minutes
Maximum towing time at 10 km/h
60 minutes
After Towing:
1
Immediately after towing, chock the wheels,
detach the tow bar and reverse the drive hub
disconnect caps.
2
Secure the tow bar back onto the machine.
3
Test steer, drive and brake functions on a level
surface prior to returning the machine to
operation. See Function Tests.
WARNING
Содержание Z-40
Страница 8: ...Operator s Manual First Edition First Printing General Safety 6 Z 62 40 Part No 1257653 General Safety...
Страница 9: ...First Edition First Printing Operator s Manual General Safety Part No 1257653 Z 62 40 7...
Страница 10: ...Operator s Manual First Edition First Printing General Safety 8 Z 62 40 Part No 1257653...
Страница 41: ...First Edition First Printing Operator s Manual Inspections Part No 1257653 Z 62 40 39...
Страница 63: ...Distributed By www genielift com...