Service Manual
September 2016
Checklist A Procedures
12
Super Straddle
Part No. 115429
A-2 Per form Pre- operation Inspection
A-2
Perform Pre-operation Inspection
Genie specifications require that this procedure be
performed every 8 hours or daily, whichever comes
first.
Completing a Pre-operation Inspection is essential
to safe machine operation. The Pre-operation
Inspection is a visual inspection performed by the
operator prior to each work shift. The inspection is
designed to discover if anything is apparently
wrong with a machine before the operator performs
the function tests. The Pre-operation Inspection
also serves to determine if routine maintenance
procedures are required.
Complete information to perform this procedure is
available in the appropriate operator's manual.
Refer to the Operator's Manual on your machine.
A-3 Per form F uncti on Tests
A-3
Perform Function Tests
Genie specifications require that this procedure be
performed every 8 hours or daily, whichever comes
first.
Completing the function tests is essential to safe
machine operation. Function tests are designed to
discover any malfunctions before the machine is
put into service. A malfunctioning machine must
never be used. If malfunctions are discovered, the
machine must be tagged and removed from
service.
Complete information to perform this procedure is
available in the appropriate operator's manual.
Refer to the Operator's Manual on your machine.
Содержание Super-Straddle
Страница 14: ...Service Manual September 2016 6 Super Straddle Part No 115429 This page intentionally left blank ...
Страница 16: ...Service Manual September 2016 8 Super Straddle Part No 115429 This page intentionally left blank ...
Страница 18: ...Service Manual September 2016 10 Super Straddle Part No 115429 This page intentionally left blank ...
Страница 26: ...Service Manual September 2016 18 Super Straddle Part No 115429 This page intentionally left blank ...
Страница 43: ......