Part No. 122985
S-80 • S-85 • S-80X
3 - 11
Section 3 • Scheduled Maintenance Procedures
February 2012
CHECKLIST
A
PROCEDURES
A-8
Perform Engine Maintenance -
Deutz and Continental Models
Engine specifications require that this one-time
procedure be performed after the first 50 hours of
operation.
Proper engine maintenance, following the engine
manufacturer's maintenance schedule, is essential
to good engine performance and service life. Failure
to perform the maintenance procedures can lead to
poor engine performance and component damage.
Required maintenance procedures for
commissioning new and overhauled engines and
additional engine information are available in the
Deutz TD2011 Operation Manual
(Deutz part number 0312 3547)
OR the
Continental TME27 Owner's Manual
(Continental part number WM10303).
Deutz TD2011 Operation Manual
Genie part number
139320
Continental TME27 Owner's Manual
Genie part number
111901
To access the engine:
1 Remove the engine tray retaining fastener
located under the engine tray. Swing the engine
tray out away from the machine and secure it
from moving.
Crushing hazard. Failure to install
the fastener into the engine tray
anchor hole to secure the engine
tray from moving could result in
death or serious injury.
A-9
Inspect the Fuel Filter/Water
Separator - Diesel Models
Note: Genie specifications require that this
procedure be performed every 100 hours or
monthly, whichever comes first.
Proper maintenance of the fuel filter/water separator
is essential for good engine performance. Failure to
perform this procedure can lead to poor engine
performance and/or hard starting, and continued
use may result in component damge. Extremely
dirty conditions may require this procedure be
performed more often.
Explosion and fire hazard. Engine
fuels are combustible. Perform this
procedure in an open, well-
ventilated area away from heaters,
sparks, flames and lighted
tobacco. Always have an approved
fire extinguisher within easy reach.
Note: Perform this procedure with the engine off.
Perkins Models:
1 Put on protective clothing and eye wear.
2 Open the engine side turntable cover and locate
the fuel filter/water separator next to the
hydraulic return filter on the bulkhead.
3 Inspect the filter bowl for water buildup.
Result: If water is present in the filter bowl
continue with steps 4 through 8.
Содержание S-80
Страница 1: ......
Страница 6: ...February2012 S 80 S 85 S 80X PartNo 122985 This page intentionally left blank iv ...
Страница 98: ...Section 4 Repair Procedures 4 8 S 80 S 85 S 80X PartNo 122985 October2011 This page intentionally left blank ...
Страница 142: ...Section 4 Repair Procedures 4 52 S 80 S 85 S 80X PartNo 122985 February2012 MANIFOLDS DE DB DC DD DF DA 6 2 5 3 4 1 ...
Страница 166: ...Section 4 Repair Procedures 4 76 S 80 S 85 S 80X PartNo 122985 February2012 This page intentionally left blank ...
Страница 178: ...5 12 S 80 S 85 S 80X PartNo 122985 February2012 Section 5 Fault Codes This page intentionally left blank ...
Страница 182: ...February2012 Section 6 Schematics 6 4 S 80 S 85 S 80X PartNo 122985 This page intentionally left blank ...
Страница 183: ...Section 6 Schematics February2012 6 5 6 6 Connector Pin Legend View 1 ...
Страница 186: ...February2012 Section 6 Schematics 6 8 Connector Pin Legend View 2 6 7 ...
Страница 187: ...Section 6 Schematics February2012 6 9 Electrical Schematic S 80 and S 85 ANSI CSA AS DeutzTD2011L04iModels 6 10 ...
Страница 190: ...February2012 Section 6 Schematics 6 12 Electrical Schematic S 80 and S 85 ANSI CSA AS DeutzTD2011L04iModels 6 11 ...
Страница 223: ...Section 6 Schematics February2012 6 45 Electrical Schematic S 80X DeutzTD2011L04IModels 6 46 ...
Страница 226: ...February2012 Section 6 Schematics 6 48 Electrical Schematic S 80X DeutzTD2011L04IModels 6 47 ...
Страница 230: ...February2012 Section 6 Schematics 6 52 Ground Control Box Switch Panel Wiring Diagram S 80X DeutzTD2011L04IModels 6 51 ...
Страница 231: ...Section 6 Schematics February2012 6 53 Platform Control Box Wiring Diagram S 80X DeutzTD2011L04IModels 6 54 ...
Страница 235: ...Section 6 Schematics February2012 6 57 Electrical Schematic S 80 and S 85 ANSI CSA AS Perkins804D 33Models 6 58 ...
Страница 238: ...February2012 Section 6 Schematics 6 60 Electrical Schematic S 80 and S 85 ANSI CSA AS Perkins804D 33Models 6 59 ...
Страница 271: ...Section 6 Schematics February2012 6 93 Electrical Schematic S 80X Perkins804D 33Models 6 94 ...
Страница 274: ...February2012 Section 6 Schematics 6 96 Electrical Schematic S 80X Perkins804D 33Models 6 95 ...
Страница 275: ...Section 6 Schematics February2012 6 97 6 98 Ground Control Box Terminal Strip Wiring Diagram S 80X Perkins804D 33Models ...
Страница 278: ...February2012 Section 6 Schematics 6 100 Ground Control Box Switch Panel Wiring Diagram S 80X Perkins804D 33Models 6 99 ...
Страница 279: ...Section 6 Schematics February2012 6 101 Platform Control Box Wiring Diagram S 80X Perkins804D 33Models 6 102 ...
Страница 283: ...Section 6 Schematics February2012 6 105 Electrical Schematic S 80 and S 85 ANSI CSA AS ContinentalTME27Models 6 106 ...
Страница 286: ...February2012 Section 6 Schematics 6 108 Electrical Schematic S 80 and S 85 ANSI CSA AS ContinentalTME27Models 6 107 ...
Страница 319: ...Section 6 Schematics February2012 6 141 6 142 Electrical Schematic S 80X ContinentalTME27Models ...
Страница 322: ...February2012 Section 6 Schematics 6 144 Electrical Schematic S 80X ContinentalTME27Models 6 143 ...
Страница 327: ...Section 6 Schematics February2012 6 149 Platform Control Box Wiring Diagram S 80X ContinentalTME27Models 6 150 ...
Страница 331: ...Section 6 Schematics February2012 6 153 6 154 Continental TME27 Engine Harness ...
Страница 334: ...February2012 Section 6 Schematics 6 156 Platform Level Cutout CTE Option 6 155 ...
Страница 335: ...Section 6 Schematics February2012 6 157 Continental Options Schematic 6 158 ...
Страница 338: ...February2012 Section 6 Schematics 6 160 Deutz and Perkins Options Schematic 6 159 ...
Страница 339: ...Section 6 Schematics February2012 6 161 6 162 12 kW Hydraulic Generator Wiring Diagram ...
Страница 342: ...February2012 Section 6 Schematics 6 164 6 163 12 kW Hydraulic Generator Electrical Schematic ...
Страница 343: ...Section 6 Schematics February2012 6 165 Belt Driven Generator Option 6 166 ...
Страница 346: ...February2012 Section 6 Schematics 6 168 Relay and Fuse Panel Legend 6 167 ...
Страница 347: ...Section 6 Schematics February2012 6 169 6 170 Hydraulic Schematic 2WD Models ...
Страница 350: ...February2012 Section 6 Schematics 6 172 Hydraulic Schematic 4WD Models 6 171 ...
Страница 352: ...February2012 Section 6 Schematics 6 174 12 kW Hydraulic Generator Hydraulic Schematic 6 173 ...