First Edition • First Printing
Operator's Manual
Transport and Lifting Instructions
Part No. 1256222
S-100HD • S-120HD
47
Observe and Obey:
5
Only qualified riggers should rig the machine.
5
Only certified crane operators should lift the
machine and only in accordance with the
applicable crane regulations.
5
Be sure the crane capacity, loading surfaces
and straps or lines are sufficient to withstand
the machine weight. See the serial label for the
machine weight.
Lifting Instructions
Fully lower and retract the boom. Move the jib boom
(if equipped) parallel with the ground. Remove all
loose items on the machine.
Use the turntable rotation lock to secure the
turntable.
Determine the center of gravity of your machine
using the table and the picture on this page.
Attach the rigging only to the designated lifting
points on the machine. There are two lifting points
on the chassis and two on the turntable.
Adjust the rigging to prevent damage to the
machine and to keep the machine level.
Use a spreader bar to keep the rigging from
damaging the machine.
Center of gravity
X Axis
Y Axis
S-100HD
1.96 m
1.23 m
S-120HD
1.89 m
1.68 m