30
Eng
lis
h
4
Push
“SIGNAL SELECTOR” to “ON” (auto mode).
The generator is ready for start by remote signal when inverter/charger joint the 2
signal contact.
After connect generator definitively with the inverter/charger you can simulate a
start/stop maneuver. Joint the signal contact and keep joint, generator start the
start up process according pint 9.3 of this manual.
After 5 minutes running you can separate the signal contact, the generator stops
and keep waiting for next order.
If you have some doubts, please contact with us
Содержание 2013022
Страница 2: ......
Страница 48: ......
Страница 94: ......
Страница 141: ......
Страница 142: ...47 Portugu s POLIGONO INDUSTRIAL NEINVER CALAHORRA LA RIOJA CONTACTO INFORMA ES INFO SG GROUP ES...