
14
ENGLISH
of the base and the table.
3. Using a 4 mm hex (Allen) key, fasten the head assembly in place by
tightening the head lock set screws (dd, fig 3) in the right side of the
head casting.
4.
Screw the three feed handles (M, fig 2 & 3) into the the threaded
holes in the hub. Instead of using the knobs for leverage and possibly
stripping them, use a wrench on the flats at the threaded ends of the
handles to tighten, but take care to fasten them only hand tight.
5. Install an M5 x 12 pan head screw from the inside of the pulley cover
through the hole and attach the knob (aa, fig 3) to the outside.
NOTE:
One or two of the feed handles may have to be temporarily
removed in future if a job involves an unusually-shaped workpiece that
interferes with handle rotation.
CHUCK
1.
Clean out the tapered hole in the chuck (K, fig 2 & 3), removing any
grease, anti-rust coating or dirt you find.
2. Clean grease, coating and dirt from the JT33 tapered spindle tip with a
clean cloth.
3.
Open the chuck's jaws as far as they will go so they are fully retracted
into the chuck.
4. Push the chuck up on the spindle as far as possible. Lightly tap the
lower end of the chuck with a piece of wood to ensure the chuck fits
tightly on the spindle.
5. To remove the chuck, see Maintenance.
6.
Clamp the chuck safety guard (J, fig 3) around the lower exposed part of
the quill tube. Do not over-tighten.
LASER BATTERIES
1.
Locate the laser switch (T, fig 3) on the left side of the head assembly.
2.
Press the tab located below the laser switch (fig 6) and raise the cover.
3. Insert 2 "AA" batteries, oriented in the directions indicated.
4. Close the switch cover.
CAUTION:
Remove these batteries from the compartment when the
tool is to be stored without use for more than a few days. If left in, the
batteries may leak and damage the laser device. Damage from leaking
batteries is not covered under the warranty.
ADJUSTMENTS
WARNING!
To reduce the risk of injury, keep pulley cover in place and
in proper working order when operating.
SPEED AND BELT TENSION
ADJUSTMENT
1. Open the belt & pulley cover (
X, fig 2 & 3
)
2. Consult the belt position / speed diagram.
fig 6
T
rpm: 570 tr/min
spindle
broche
motor
moteur
rpm: 900 tr/min
spindle
broche
motor
moteur
rpm: 1390 tr/min
spindle
broche
motor
moteur
rpm: 2050 tr/min
spindle
broche
motor
moteur
rpm: 3050 tr/min
spindle
broche
motor
moteur
DP2002 belt spindle label
100 x 40 mm R=2
Содержание DP2002
Страница 21: ...21 170207 ENGLISH SCHEMATIC DRAWING...
Страница 22: ...22 ENGLISH...
Страница 43: ...43 170207 FRAN AIS SCH MA...
Страница 44: ...44 FRAN AIS...