7

3.3 VOLTAGE 

CHECKS

1.  Turn ON the UTILITY power supply to the LTS using the 

UTILITY SERVICE DISCONNECT circuit breaker.

 

 PROCEED WITH CAUTION. THE TRANSFER 

SWITCH IS NOW ELECTRICALLY HOT. 

CONTACT WITH LIVE TERMINALS RESULTS 

IN EXTREMELY HAZARDOUS AND POSSIBLY 

FATAL ELECTRICAL SHOCK.

2.   With an accurate AC voltmeter, check for correct voltage. 

Measure across ATS terminal lugs N1 and N2. Also check N1 

to NEUTRAL and N2 to NEUTRAL.

3.  When certain that UTILITY supply voltage is correct and compat-

ible with transfer switch ratings, turn OFF the UTILITY supply to 

the transfer switch.

4.   On the generator panel, set the AUTO/OFF/ MANUAL switch to 

MANUAL position. The generator should crank and start.

The voltage measurements should be as follows:

N1 - N2

240 VAC Nominal

N1 - Neutral

120 VAC Nominal

N2 - Neutral

120 VAC Nominal

5.   Let the generator stabilize and warm up at no-load for at least 

five minutes.

6.   Set the generator's main circuit breaker (CB1) to its ON or 

CLOSED position.

 

 PROCEED WITH CAUTION. GENERATOR 

OUTPUT VOLTAGE IS NOW BEING 

DELIVERED TO TRANSFER SWITCH 

TERMINALS. CONTACT WITH LIVE 

TERMINALS RESULTS IN EXTREMELY 

DANGEROUS AND POSSIBLY FATAL 

ELECTRICAL SHOCK.

7.   With an accurate AC voltmeter and frequency meter, check the 

no-load, voltage and frequency.

 

Measure across ATS terminal lugs E1 to E2. Also check E1 to 

NEUTRAL and E2 to NEUTRAL.

 a. 

Frequency 

.................................................... 60-62 

Hertz

 

b.  Terminals E1 to E2 ....................................... 240-246 VAC

 

c.  Terminals E1 to NEUTRAL ............................ 120-123 VAC

 

d.  Terminals E2 to NEUTRAL ............................ 120-123 VAC

8.  Set the generator’s main circuit breaker (CB1) to its OFF or 

OPEN position.

9.  Set the AUTO/OFF/MANUAL switch to the OFF position to shut 

down the generator.

NOTE:

Do NOT proceed until generator AC output voltage and frequen-

cy are correct and within stated limits. If the no-load voltage is 

correct but no-load frequency is incorrect, the engine governed 

speed may require adjustment. If no-load frequency is correct 

but voltage is not, the voltage regulator may require adjustment.

Move handle UP for the

non-essential loads OFF.

Move handle DOWN for the

non-essential loads ON.

Attach handle to the moveable

contact carrier arm.

NOTE:

  Return handle to storage position in enclosure when finished with manual transfer.

Figure 3.2 — Actuating LSS Transfer Switch

Operation

Содержание RTSJ200A3

Страница 1: ...This manual should remain with the unit Owner s Manual LTS Load Shed Switch...

Страница 2: ...infor mation on tags decals and labels that may be affixed to the transfer switch Replace any decal or label that is no longer legible DANGER Connection of a generator to an electrical system normall...

Страница 3: ...hazardous and possibly LETHAL electric shock DO NOT WORK ON THE TRANSFER SWITCH UNTIL ALL POWER VOLTAGE SUPPLIES TO THE SWITCH HAVE BEEN POSITIVELY TURNED OFF Competent qualified personnel should inst...

Страница 4: ...will operate and disconnect the non essential loads which results in a reduction in the load on the generator The third function is a 16 circuit load center to connect the criti cal loads to These lo...

Страница 5: ...switches 1 4 For one shot operation mode set DIP switch 5 to ON Reconnection of the non essential loads will occur one time after the time set on DIP switches 1 4 If DIP switch 5 is OFF the LSC will a...

Страница 6: ...stalling Do not drop the switch Protect the switch against impact at all times and against construction grit and metal chips Never install a transfer switch that has been damaged This transfer switch...

Страница 7: ...rals are to be connected on the busbars mounted on the load center next to the branch circuit breakers 2 6 CONNECTING CONTROL WIRES Control system interconnections consist of N1 N2 and T1 and leads 0...

Страница 8: ...L position no further action is required If the handle is DOWN proceed with Step 1 Step 1 With the handle inserted into the moveable contact carrier arm move handle UP Be sure to hold on to the handle...

Страница 9: ...NOW BEING DELIVERED TO TRANSFER SWITCH TERMINALS CONTACT WITH LIVE TERMINALS RESULTS IN EXTREMELY DANGEROUS AND POSSIBLY FATAL ELECTRICAL SHOCK 7 With an accurate AC voltmeter and frequency meter chec...

Страница 10: ...ual Operation Handle and operating lever of transfer switch should be in UP position 10 Turn on the UTILITY power supply to transfer switch using the UTILITY SERVICE DISCONNECT circuit breaker The uti...

Страница 11: ...9 Notes...

Страница 12: ...10 Notes...

Страница 13: ...11 Notes...

Страница 14: ...12 Installation Diagram 200 Amp Enclosure Drawing 0G8775 B...

Страница 15: ...8 9 B 2 1 3 9 8 7 B D1 A 6 3 4 5 2 1 7 6 3 2 1 4 5 1 2 2 1 3 1 2 3 4 5 6 J4 RL2 D2 1 2 2 1 3 TO LOADS NON ESSENTIAL TOP TERMINALS TO GROUNDING ELECTRODE 194 OPTIONAL ALARM CONTACT CUSTOMER SUPPLIED N...

Страница 16: ...Part No 0H8807 Revision E 08 01 13 Printed in U S A...

Отзывы: