Generac Power Systems RTSJ200A3 Скачать руководство пользователя страница 1

This manual should remain with the unit.

Owner's Manual

LTS Load Shed Switch

Содержание RTSJ200A3

Страница 1: ...This manual should remain with the unit Owner s Manual LTS Load Shed Switch...

Страница 2: ...infor mation on tags decals and labels that may be affixed to the transfer switch Replace any decal or label that is no longer legible DANGER Connection of a generator to an electrical system normall...

Страница 3: ...hazardous and possibly LETHAL electric shock DO NOT WORK ON THE TRANSFER SWITCH UNTIL ALL POWER VOLTAGE SUPPLIES TO THE SWITCH HAVE BEEN POSITIVELY TURNED OFF Competent qualified personnel should inst...

Страница 4: ...will operate and disconnect the non essential loads which results in a reduction in the load on the generator The third function is a 16 circuit load center to connect the criti cal loads to These lo...

Страница 5: ...switches 1 4 For one shot operation mode set DIP switch 5 to ON Reconnection of the non essential loads will occur one time after the time set on DIP switches 1 4 If DIP switch 5 is OFF the LSC will a...

Страница 6: ...stalling Do not drop the switch Protect the switch against impact at all times and against construction grit and metal chips Never install a transfer switch that has been damaged This transfer switch...

Страница 7: ...rals are to be connected on the busbars mounted on the load center next to the branch circuit breakers 2 6 CONNECTING CONTROL WIRES Control system interconnections consist of N1 N2 and T1 and leads 0...

Страница 8: ...L position no further action is required If the handle is DOWN proceed with Step 1 Step 1 With the handle inserted into the moveable contact carrier arm move handle UP Be sure to hold on to the handle...

Страница 9: ...NOW BEING DELIVERED TO TRANSFER SWITCH TERMINALS CONTACT WITH LIVE TERMINALS RESULTS IN EXTREMELY DANGEROUS AND POSSIBLY FATAL ELECTRICAL SHOCK 7 With an accurate AC voltmeter and frequency meter chec...

Страница 10: ...ual Operation Handle and operating lever of transfer switch should be in UP position 10 Turn on the UTILITY power supply to transfer switch using the UTILITY SERVICE DISCONNECT circuit breaker The uti...

Страница 11: ...9 Notes...

Страница 12: ...10 Notes...

Страница 13: ...11 Notes...

Страница 14: ...12 Installation Diagram 200 Amp Enclosure Drawing 0G8775 B...

Страница 15: ...8 9 B 2 1 3 9 8 7 B D1 A 6 3 4 5 2 1 7 6 3 2 1 4 5 1 2 2 1 3 1 2 3 4 5 6 J4 RL2 D2 1 2 2 1 3 TO LOADS NON ESSENTIAL TOP TERMINALS TO GROUNDING ELECTRODE 194 OPTIONAL ALARM CONTACT CUSTOMER SUPPLIED N...

Страница 16: ...Part No 0H8807 Revision E 08 01 13 Printed in U S A...

Отзывы: