Generac Power Systems PV Link 010023 Скачать руководство пользователя страница 22

18

Installation Manual for PV Link and SnapRS

Figure 6-4. PVRSS Commissioning (2 of 3)

6.

See 

Figure 6-5

. The LCD will display Test

-

ing  PRVSS  during  the  testing  process.

Upon  completion,  the  LCD  will  read  Low

Sun  or  Making  Power,  depending  upon

available PV voltage.

Figure 6-5. PVRSS Commissioning (3 of 3)

7.

Complete steps 1  – 6 for  each  PV link  in

the system.

Figure 6-6. SnapRS Check

NOTE: 

To verify a PV Link is working properly,

navigate  to  the  Mod.Settings  page  and  con

-

firm  the  SnapRSInstalld  value  matches  the

number of SnapRSDetected.

PLM Channel:
Vin Startup:

String Count:

Cancel

Commit

1

135.0V

2

Enable PVRSS:

on

012924

Photovoltaics

PWRc

e

ll X7602

59.0kWh

115v

0W

-xx

t

e

sting PVRSS

Pow

e

r:

PV Voltag

e

:

E-total:

010033

012943

SnapRSInstalld:
SnapRSDetected:

Override PVRSS:

Cancel

Commit

7
7

off

Setpoint

Range

Default

Description

PLM Channel

1-12

1

Channel for REbus communications. All devices in a sys

-

tem must use the same channel (except REbus Beacon).

Vin Strartup

60-135 Volts

135V

Minimum input voltage from the PV substring for the PV 

Link to make power. 

String Count

1-2

1

Number of substrings plugged into the input of a PV Link. 

Set to a value of 2 if paralleling two series substrings for 

high voltage, 96 cell solar panels.

Enable PVRSS

on/off

off

Enables the photovoltaic rapid shutdown system 

(PVRSS). Turn this setting 'on' by selecting to 'Enable w/

PVRSS' if SnapRS are installed.

SnapRSIn

-

stalled

0-10

0

This is the number of SnapRS that are counted and 

stored upon the first successful count of SnapRS.

SnapRSDe

-

tected

0-10

0

This is the number of SnapRS that are detected after 

each subsequent count. Counts occur daily.

Override 

PVRSS

on/off

off

This setting overrides a key feature of the PVRSS, clos

-

ing the SnapRS devices without requiring a count. Do not 

leave override 'on.' Use only for temporary troubleshoot

-

ing purposes. 

Содержание PV Link 010023

Страница 1: ...d in a critical life support application Failure to adhere to this warning could result in death or serious injury Register your Generac product at https pwrfleet generac com 1 888 GENERAC 888 436 372...

Страница 2: ...ty to perform all safety checks to verify that all maintenance for safe operation is performed promptly and to have the equipment checked periodically by an ASD Normal maintenance service and replacem...

Страница 3: ...ormation 7 Component Locations 7 Section 3 Installation Design 9 Installation Design Worksheet 9 Section 4 PVRSS Compliance Guidelines 11 Section 5 Mounting and Connecting 13 Installation Guidelines 1...

Страница 4: ...This page intentionally left blank...

Страница 5: ...erating technique that the manufacturer does not specifically recommend verify that it is safe for others and does not render the equipment unsafe Throughout this publication and on tags and decals af...

Страница 6: ...o ensure the completed PV system meets the rapid shutdown functional requirements This equip ment must be installed according to the manu facturer s installation instructions 000191 DANGER Automatic s...

Страница 7: ...s injury equipment and property damage DANGER 000152 DANGER Electrocution Verify electrical system is properly grounded before applying power Failure to do so will result in death or serious injury 00...

Страница 8: ...4 Installation Manual for PV Link and SnapRS This page intentionally left blank...

Страница 9: ...voltage VDC 420 open circuit Nominal output REbus DC nanogrid 380 VDC data Maximum output current continuous A 8 Standby power W 1 Topology Boost converter Protections Ground fault protection arc fau...

Страница 10: ...nk is intended for use with 60 cell 72 cell or 96 cell residential DC solar modules Solar modules must not require positive or negative grounding as this would interfere with PLC communications NOTE O...

Страница 11: ...NEC requires rapid shutdown only on the conductors leaving the PV array The 2017 and 2020 NEC require rapid shutdown at the PV module level and on the conductors leaving array PV Link is a PV rapid sh...

Страница 12: ...8 Installation Manual for PV Link and SnapRS This page intentionally left blank...

Страница 13: ...e limit 3 Divide the PV Link Vmp Voltage at Maxi mum Power by the panel Vmp and round down to determine the number of panels that can be connected in series to the PV Link without exceeding maximum po...

Страница 14: ...10 Installation Manual for PV Link and SnapRS This page intentionally left blank...

Страница 15: ...cation of the PVRSS initiator and its labeling To meet 2017 and 2020 compliance 1 The 2017 and 2020 NEC requires the PVRSS initiator be located at a readily accessible location outside the building Th...

Страница 16: ...12 Installation Manual for PV Link and SnapRS This page intentionally left blank...

Страница 17: ...G ELECTRIC SHOCK HAZARD THE DC CONDUCTORS OFTHIS PHOTOVOLTAIC SYSTEM ARE UNGROUNDED AND MAY BE ENERGIZED ELECTRIC SHOCK HAZARD DC OUTPUT CONDUCTORS MAY BE ENERGIZED REGARDLESS OF SUN EXPOSURE CAUTION...

Страница 18: ...lation or flagging Mark negative REbus field wiring leads with blue insulation or flagging Connect multiple optimizers in parallel using MC4 branch connectors or a com biner box Connecting PV Modules...

Страница 19: ...he input of the PV Link NOTE Install SnapRS devices prior to secur ing PV modules to the racking To install SnapRS devices 1 See Figure 5 5 For each PV module in the PV string connect the positive end...

Страница 20: ...st be one SnapRS device for each module in the array Additionally the String Count set ting on the PV Link device page must be set to 2 Figure 5 6 Single PV Substring with Parallel Series Inputs and S...

Страница 21: ...s Manual for more information on sys tem modes and commissioning To enable and commission PV Link Ensure REbus are connected with correct polarity to each PV Link Ensure each PV Link has a low resis t...

Страница 22: ...cription PLM Channel 1 12 1 Channel for REbus communications All devices in a sys tem must use the same channel except REbus Beacon Vin Strartup 60 135 Volts 135V Minimum input voltage from the PV sub...

Страница 23: ...orking properly When an arc fault is detected the status message reads Arc Fault To conduct an AFD test 1 On the PWRcell Inverter control panel use the left or right arrows to scroll to the page for t...

Страница 24: ...20 Installation Manual for PV Link and SnapRS This page intentionally left blank...

Страница 25: ...ce If the PV Link is not operating as expected or if a PV Link error message appears on the Generac PWRcell Inverter control panel LCD display contact the nearest Independent Authorized Service Dealer...

Страница 26: ...22 Installation Manual for PV Link and SnapRS This page intentionally left blank...

Страница 27: ...Polarity Check REbus Wiring Ground May Need to Check REbus Fuses Known PV Link Offline A PV Link that has communicated with the inverter previously shows offline at its device page when it s connecti...

Страница 28: ...performed on SnapRS devices in the field However some simple digital multimeter DMM checks can confirm the general health of a SnapRS device DMM Red to SnapRS DMM Black to SnapRS Resistance reads 300...

Страница 29: ...Installation Manual for PV Link and SnapRS 25 This page intentionally left blank...

Страница 30: ...26 Installation Manual for PV Link and SnapRS This page intentionally left blank...

Страница 31: ......

Страница 32: ...ights reserved Specifications are subject to change without notice No reproduction allowed in any form without prior written consent from Generac Power Systems Inc Generac Power Systems Inc S45 W29290...

Отзывы: