Electrical Connections
26
Installation Guidelines for 60 Hz PowerPact™
Main AC Wiring
Figure 6-2. Main AC Wiring
NOTE:
Main AC wiring must be in accordance with local
jurisdiction and codes.
1.
Strip the insulation off the wire ends. Do not
remove excessive insulation.
2.
Open the controller access panel and latch it.
Loosen the lugs of the Main Breaker through the
access holes.
3.
Insert a power wire (E1 or E2) into the bottom lug
of the Main Breaker. Torque to the proper
specification.
4.
Connect the Neutral wire to the Neutral bar and
torque to the required specification. See
.
5.
Connect the Ground wire to the Ground bar and
torque to the required specification. See
.
6.
Plug the breaker access hole with the cap plugs
provided (see
).
7.
Unlatch the controller access panel by pulling
towards you and then close the lid.
8.
Confirm the integrity of the ground wire connection
between the electrical access panel and the
ground lug while closing the customer connection
box using the two short hex socket screws.
NOTE:
Neutral Bonding - For installations which require
the neutral to be bonded to the ground, this is to be done
on the customer connections terminals inside the
generator. Connect a suitably sized wire from the neutral
bar to the ground bar. This is normally required when the
generator is the source in a separately derived system. It
is not required when the generator is a backup source in
a utility supplied electrical system with a 2-pole transfer
switch. See
.
NOTE:
Torque all wiring lugs, bus bars and connection
points to the proper torque specifications. Torque
specifications for the Main Line Circuit Breaker (MLCB)
can be found on a decal located on the inside of the
electrical access panel.
Utility Service Circuit Breaker (not supplied)
This switch is listed for use with the following one inch
breakers:
•
Siemens*
•
Murray*
•
Eaton
•
Square D
*
Including GFCI, AFCI and tandem breakers up to 50 A
.
NOTE:
For branch circuits over 50A, only listed Siemens
or Murray circuit breakers should be used.
100
100A OR 200
OR 200A
HOUSE MAIN SE
HOUSE MAIN SERVICE
VICE
CIRCUI
CIRCUIT
BREAKER
BREAKER
50
50A 2-POLE
2-POLE
T1
T1
N2
N2
N1
N1
23
23
194
194
E2
E2
E1
E1
GND
GND
GENER
GENERATOR CUS
OR CUSTOMER
OMER
CONNECTION
CONNECTION
8 CIRCUI
8 CIRCUIT
T TRANSFER SWITCH
TRANSFER SWITCH
CUS
CUSTOMER SUPPLIED
OMER SUPPLIED
JUNCTION BOX
JUNCTION BOX
T1
T1
N1
N1
23
23
194
194
N2
N2
E2
E2
E1
E1
N1
N1 N2
N2
001132
Содержание PowerPact 7.5 kW
Страница 14: ...Unpacking and Inspection 10 Installation Guidelines for 60 Hz PowerPact This page intentionally left blank ...
Страница 20: ...Generator Placement 16 Installation Guidelines for 60 Hz PowerPact This page intentionally left blank ...
Страница 40: ...Troubleshooting 36 Installation Guidelines for 60 Hz PowerPact This page intentionally left blank ...
Страница 44: ...Accessories 40 Installation Guidelines for 60 Hz PowerPact This page intentionally left blank ...
Страница 51: ......