Section 4: Operation

Homelink Upgradeable Manual Transfer Switch Owner’s Manual

11

5.

Press rocker button towards UTILITY direction (the
transfer switch will not operate without utility
voltage present). The Utility Light is now off and in
normal operating condition (Utility voltage is
present and transfer switch is in normal utility
mode). Any loads will be energized via the power
panel of the transfer switch.

6.

Ensure the Generator Neutral and Ground are
connected on the generator. The Generator should
be properly tied to earth ground as local
regulations require. 

7.

Connect the generator to the Generac Portable
Inlet Box using the Generac Portable Power Cord. 

8.

Turn on the generator. The amber indicator light for
Generator Power will illuminate on the front panel
of the transfer switch any time generator voltage is
available. The generator is now electrically isolated
from any electrical connections beyond the transfer
switch.

9.

Press rocker button towards GENERATOR
POWER direction. The Utility Light will illuminate to
indicate utility voltage is available for transfer back
to the utility. The generator light will continue to
illuminate to indicate the presence of generator
voltage. All loads through the transfer switch panel
are now being supplied by the generator.

10.

Turn OFF the utility power supply to the transfer
switch, using the means provided (such as utility
main line circuit breaker). The Utility Light will no
longer be illuminated, as utility voltage is no longer
present. 

11.

Confirm any loads being supplied by the transfer
switch panel are energized by the generator.

12.

Turn ON the utility power supply to the transfer
switch, using the means provided (such as utility
main line circuit breaker). The Utility Light will again
illuminate.

13.

Press rocker button towards UTILITY direction.
The Utility Light will turn off. The transfer switch is
now in its normal operating mode. All loads from
the transfer switch panel are provided by the utility.

14.

Let the generator run at no-load for several
minutes. Then, shut down the generator. The
Generator Power Light on the transfer switch will
turn off.

15.

Disconnect the generator portable power cord.

16.

Store the generator as suggested by the
manufacturer.

17.

Transfer switch testing is complete and ready for
use.

NOTE: 

The transfer switch requires electric power to

operate with the rocker button. The transfer switch will
not transfer to utility mode if the Utility Light is not illumi-

nated prior to pressing the rocker button. The transfer
switch will not transfer to generator mode if the Generator
Light is not illuminated (this safeguards against acciden-
tal transfer to the generator if generator power is not
present).

Checking Automatic Operation

(Automatic HSB Generator Only)

To check the system for proper automatic operation,
proceed as follows:

1.

Verify generator is OFF.

2.

Verify switch is de-energized.

3.

Install front cover of the transfer switch.

4.

Turn the utility power supply to the transfer switch
ON, using the utility main line circuit breaker.

5.

Set the generator main circuit breaker to ON.

6.

On the generator panel, select AUTO. The system
is now ready for automatic operation.

7.

Turn utility power supply to the transfer switch OFF.

With the generator ready for automatic operation, the
engine should crank and start when the utility source
power is turned OFF after a ten second delay (factory
default setting). After starting, the transfer switch should
connect load circuits to the standby side after the engine
warm-up delay. Let the system operate through its entire
automatic sequence of operation.
With the generator running and loads powered by
generator AC output, turn ON the utility power supply to
the transfer switch. The following should occur:

After approximately 15 seconds, the switch should
transfer loads back to the utility power source.

Approximately one minute after re-transfer, the
engine should shut down.

With the generator in the AUTOMATIC mode, the system
is now set for fully automatic operation.

Installation Summary

1.

Verify the installation has been properly performed
as outlined by the manufacturer and that it meets
all applicable laws and codes.

2.

Verify proper operation of the system as outlined in
the appropriate installation and owner’s manuals.

3.

Educate the end-user on the proper operation,
maintenance and service call procedures.

Содержание 006852

Страница 1: ...rvice support product support lookup Pour le fran ais visiter http www generac com service support product support lookup Register your Generac product at WWW GENERAC COM 1 888 GENERAC 888 436 3722 MO...

Страница 2: ...product contains or emits chemicals known to the state of California to cause cancer birth defects and other reproductive harm 000004 WARNING California Proposition 65 Engine exhaust and some of its...

Страница 3: ...ng Branch Circuit Conductors Canadian Installations 7 Installing Breakers 7 Breakers Listed for Use 7 Portable Generator Grounding Requirements 7 Automatic Upgrade Kit Installation 7 Section 4 Operati...

Страница 4: ...iv Homelink Upgradeable Manual Transfer Switch Owner s Manual This page intentionally left blank...

Страница 5: ...MODIFY THIS MANUAL AT ANY TIME Safety Rules The manufacturer cannot anticipate every possible circumstance that might involve a hazard The warnings in this manual and on tags and decals affixed to the...

Страница 6: ...death serious injury and equipment damage 000195 DANGER Electrocution equipment and property damage Handle transfer switches carefully when installing Never install a damaged transfer switch Doing so...

Страница 7: ...heating equipment where the sum of motor full load ampere ratings and the ampere ratings of other loads do not exceed the ampere rating of the switch and the tungsten load does not exceed 30 percent...

Страница 8: ...e the following NFPA 70 National Electrical Code UL 1008 STANDARD FOR SAFETY AUTOMATIC TRANSFER SWITCHES UL67 Panel boards NOTE To ensure code compliance it is essential to use the latest version of a...

Страница 9: ...to the bottom plate For installations where side clearance exceeds 12 inches on both sides remove the screw that secures the bottom plate to the box For wiring entry into the back of the PIB install...

Страница 10: ...ct which branch circuits will be protected by the generator in the normal power panel board 2 Turn the circuit breaker in the normal power panel board to the off position 3 Remove the ungrounded hot c...

Страница 11: ...tion requirements for the wiring method s selected NOTE The two foot pre wire whip can be shortened if needed or removed and replaced with field wiring The factory installed branch circuits and circui...

Страница 12: ...er onto the neutral terminal bar in the transfer switch E in Figure 3 5 10 Terminate the normal power feeder conductors to N1 and N2 on the transfer mechanism F in Figure 3 5 11 Terminate the panelboa...

Страница 13: ...roceeding verify the position of the switch by observing the position of manual operation handle in Figure 4 1 If the handle is DOWN the contacts are closed in the NORMAL UTILITY position no further a...

Страница 14: ...The generator now powers all LOAD circuits Check generator operation under load as follows Turn on electrical loads to the full rated wattage amperage capacity of the generator DO NOT OVERLOAD With m...

Страница 15: ...r Light on the transfer switch will turn off 15 Disconnect the generator portable power cord 16 Store the generator as suggested by the manufacturer 17 Transfer switch testing is complete and ready fo...

Страница 16: ...f turning the unit off for longer than 24 hours remove the F1 fuse from the generator controller To turn the generator ON 1 Reinstall F1 fuse if necessary 2 Put the generator back into AUTO and allow...

Страница 17: ...3 Section 5 Drawings and Diagrams Installation Drawing No 0K8843 A 7 08mm 0 3 4 42mm 0 2 R4mm R0 2 R7mm R0 3 KNOCKOUT SUITABLE FOR 3 4 1 CONDUIT SIZE IF 2 FT WHIP NOT INCLUDED 292mm 11 5 279mm 11 0 37...

Страница 18: ...ion Drawing No 0K8845 A Manual Transfer Connections 100A OR 200A SERVICE HOUSE MAIN CIRCUIT BREAKER 50A 2 POLE 8 CIRCUIT TRANSFER SWITCH NEUT N2 N1 E1 E2 GND GND NEUT POWER INLET BOX NOTE WHEN UTILIZE...

Страница 19: ...r s Manual 15 Interconnection Drawing No 0K8844 C Automatic Transfer Connections 100A OR 200A SERVICE HOUSE MAIN CIRCUIT BREAKER 50A 2 POLE T1 N2 N1 23 194 E2 E1 GND T1 N2 N1 23 194 E2 E1 N1 N2 GENERA...

Страница 20: ...Section 5 Drawings and Diagrams 16 Homelink Upgradeable Manual Transfer Switch Owner s Manual This page intentionally left blank...

Страница 21: ......

Страница 22: ...c All rights reserved Specifications are subject to change without notice No reproduction allowed in any form without prior written consent from Generac Power Systems Inc Generac Power Systems Inc S45...

Отзывы: