Section 3: Installation

6

Homelink Upgradeable Manual Transfer Switch Owner’s Manual

5.

Strip and insert incoming leads into terminals on
power inlet. Insert white wire (neutral) into nickel
plated screw terminal or white marking on the inlet. 

6.

Carefully fold wires into the enclosure and reattach
the bottom assembly or inlet onto box with screw
removed earlier.

Connecting Power Source and 

Load Lines

Installation and interconnection diagrams are provided in
the 

Drawings and Diagrams

 section of this manual. 

NOTE: 

All installations must comply with national, state

and local codes. It is the responsibility of the installer to
perform an installation that will pass the final electrical
inspection.

The utility supply, generator, and customer load
connections are made at the transfer switch mechanism,
inside the switch enclosure.
Conductor sizes must be adequate to handle the
maximum current to which they will be subjected, based
on the 75°C column of tables, charts, etc. used to size
conductors. The installation must comply fully with all
applicable codes, standards and regulations.

NOTE: 

If aluminum conductors are used, apply corrosion

inhibitor to conductors. After tightening terminal lugs,
carefully wipe away any excess corrosion inhibitor.

Tighten terminal lugs to the torque values as noted on the
inside of the door.

Connect power source and load conductors to clearly
marked terminal lugs on transfer mechanism as follows:

1.

Install a 2-pole, 50 Amp breaker in the main distri-
bution panel. This will be the utility (normal) power 
source for transfer switch.

2.

Customer LOAD leads are pre-wired at the factory.

NOTE: 

Conductors must be properly supported, of

approved insulative qualities, protected by approved
conduit, and of the correct wire gauge size in accordance
with applicable codes.

Connecting Front Panel Wiring

Utilize the quick disconnect connector in the wiring
harness to remove the front panel during service or
installation. Verify that power and load lines are
disconnected any time the front panel is removed.

Installing Branch Circuit 

Conductors – USA Installations

1.

Select which branch circuits will be protected by 
the generator in the normal power panel board. 

2.

Turn the circuit breaker in the normal power panel
board to the off position.

3.

Remove the ungrounded (hot) conductor from the
circuit breaker and neutral conductor from the
neutral terminal bar in the normal power panel
board.

NOTE: 

Multi-wire branch circuits must be connected to

circuit breakers that are adjacent to each other. If the
circuit to be protected is part of a multi-wire branch circuit,
the entire multi-wire branch circuit must be relocated to
the transfer switch panel board (See NEC 210.4). The
branch circuit wiring can be removed from the normal
power panel board and installed in the transfer switch
panel board, or spliced onto new branch circuit wiring
originating from the transfer switch panel board.

4.

If the normal power panel board is being used as a
junction box for the protected branch circuit
conductors, install the 2 foot conduit, raceway(s),
or other approved wiring method between the
transfer switch panel board and normal power
panel board.

5.

Install properly sized branch circuit conductors
between the transfer switch panel board to the
branch circuit conductors to be protected by the
transfer switch, if not using factory supplied wiring.

6.

Use listed wire nuts or any other approved
termination device to connect the branch circuit
conductors.

7.

Install the provided label on the existing panel
board that indicates the location of the
disconnecting means for the pass through
conductors.

8.

If the generator protected branch circuit conductors
are being re-installed into the transfer switch panel
board, punch the required sized hole(s) for the
cable, conduit, or raceway.

9.

Route the branch circuit conductors into the
transfer switch and terminate the equipment
ground conductor on the equipment ground
terminal bar, the neutral on the neutral terminal bar,
and the ungrounded (hot) on the circuit breaker
terminal.

Electrocution. Turn utility and emergency
power supplies to OFF before connecting 
power source and load lines. Failure to do so 
will result in death or serious injury.

 

(000116)

DANGER

(000120)

CAUTION

Equipment damage. Verify all conductors are 
tightened to the factory specified torque value. 
Failure to do so could result in damage 
to the switch base.

 

Содержание 006852

Страница 1: ...rvice support product support lookup Pour le fran ais visiter http www generac com service support product support lookup Register your Generac product at WWW GENERAC COM 1 888 GENERAC 888 436 3722 MO...

Страница 2: ...product contains or emits chemicals known to the state of California to cause cancer birth defects and other reproductive harm 000004 WARNING California Proposition 65 Engine exhaust and some of its...

Страница 3: ...ng Branch Circuit Conductors Canadian Installations 7 Installing Breakers 7 Breakers Listed for Use 7 Portable Generator Grounding Requirements 7 Automatic Upgrade Kit Installation 7 Section 4 Operati...

Страница 4: ...iv Homelink Upgradeable Manual Transfer Switch Owner s Manual This page intentionally left blank...

Страница 5: ...MODIFY THIS MANUAL AT ANY TIME Safety Rules The manufacturer cannot anticipate every possible circumstance that might involve a hazard The warnings in this manual and on tags and decals affixed to the...

Страница 6: ...death serious injury and equipment damage 000195 DANGER Electrocution equipment and property damage Handle transfer switches carefully when installing Never install a damaged transfer switch Doing so...

Страница 7: ...heating equipment where the sum of motor full load ampere ratings and the ampere ratings of other loads do not exceed the ampere rating of the switch and the tungsten load does not exceed 30 percent...

Страница 8: ...e the following NFPA 70 National Electrical Code UL 1008 STANDARD FOR SAFETY AUTOMATIC TRANSFER SWITCHES UL67 Panel boards NOTE To ensure code compliance it is essential to use the latest version of a...

Страница 9: ...to the bottom plate For installations where side clearance exceeds 12 inches on both sides remove the screw that secures the bottom plate to the box For wiring entry into the back of the PIB install...

Страница 10: ...ct which branch circuits will be protected by the generator in the normal power panel board 2 Turn the circuit breaker in the normal power panel board to the off position 3 Remove the ungrounded hot c...

Страница 11: ...tion requirements for the wiring method s selected NOTE The two foot pre wire whip can be shortened if needed or removed and replaced with field wiring The factory installed branch circuits and circui...

Страница 12: ...er onto the neutral terminal bar in the transfer switch E in Figure 3 5 10 Terminate the normal power feeder conductors to N1 and N2 on the transfer mechanism F in Figure 3 5 11 Terminate the panelboa...

Страница 13: ...roceeding verify the position of the switch by observing the position of manual operation handle in Figure 4 1 If the handle is DOWN the contacts are closed in the NORMAL UTILITY position no further a...

Страница 14: ...The generator now powers all LOAD circuits Check generator operation under load as follows Turn on electrical loads to the full rated wattage amperage capacity of the generator DO NOT OVERLOAD With m...

Страница 15: ...r Light on the transfer switch will turn off 15 Disconnect the generator portable power cord 16 Store the generator as suggested by the manufacturer 17 Transfer switch testing is complete and ready fo...

Страница 16: ...f turning the unit off for longer than 24 hours remove the F1 fuse from the generator controller To turn the generator ON 1 Reinstall F1 fuse if necessary 2 Put the generator back into AUTO and allow...

Страница 17: ...3 Section 5 Drawings and Diagrams Installation Drawing No 0K8843 A 7 08mm 0 3 4 42mm 0 2 R4mm R0 2 R7mm R0 3 KNOCKOUT SUITABLE FOR 3 4 1 CONDUIT SIZE IF 2 FT WHIP NOT INCLUDED 292mm 11 5 279mm 11 0 37...

Страница 18: ...ion Drawing No 0K8845 A Manual Transfer Connections 100A OR 200A SERVICE HOUSE MAIN CIRCUIT BREAKER 50A 2 POLE 8 CIRCUIT TRANSFER SWITCH NEUT N2 N1 E1 E2 GND GND NEUT POWER INLET BOX NOTE WHEN UTILIZE...

Страница 19: ...r s Manual 15 Interconnection Drawing No 0K8844 C Automatic Transfer Connections 100A OR 200A SERVICE HOUSE MAIN CIRCUIT BREAKER 50A 2 POLE T1 N2 N1 23 194 E2 E1 GND T1 N2 N1 23 194 E2 E1 N1 N2 GENERA...

Страница 20: ...Section 5 Drawings and Diagrams 16 Homelink Upgradeable Manual Transfer Switch Owner s Manual This page intentionally left blank...

Страница 21: ......

Страница 22: ...c All rights reserved Specifications are subject to change without notice No reproduction allowed in any form without prior written consent from Generac Power Systems Inc Generac Power Systems Inc S45...

Отзывы: