background image

 

 

Genebre Building. Av. de Joan Carles I, 46-48 
08908 L'Hospitalet de Llobregat. Barcelona (Spain) 
[email protected]   - www.genebre.es 

 

 

GENEBRE S.A.                

         UPDATE DATE: 27/05/2021                      UPDATE NUMBER:  4 

  
 

12 

 

  Remove the pilot valve. 

  Remove the o-ring, place the throttle and insert the o-ring again. Be careful not to 

leave any foreign bodies in the orifice of the throttle. 

  Perform the same operation on both air outputs (OUT 1 and OUT 2). 

  Replace the pilot valve. 

 

                 

 

    

If the oscillation persists after performing this operation, please contact Genebre S.A. 

 

 

 
8.6 Transmitter regulation (article 5951 04 only) 

 

If necessary, the transmission settings should be set so that the output signal settings 
match the settings of the signal sent (4 / 20 mA). 

 

8.6.1 Connect 24VDC power source, series connect amperemeter convenient for 
observing the feedcack signal

’s current value.

 

 
Observe the value of the amperemeterr: it must be between 4mA and 20 mA. 
 
8.6.2 Press the "enter" button until the indicator light comes on, release the 

“enter” button 

and the indicator light flashes indicating that regulation begins. 
 
Observe the aperemeter value: the value should be 4 mA, if there is deviation, can press 
the 

“+” button or “-“ button, adjust the current value. 

 
8.6.3  Feedback signal 0% (4 mA) position adjusting 
The valve locate in original 0% (4 mA) position. Press t

he “+” button or “-“button , adjust 

the current value, then press the 

“enter” button. 

Observe the amperemeter value:  if the amperemeter value jump from 4 mA to 8 mA 
around, means the feedback signal 0% (4 mA) position confirmed. Module waiting for the 
feedback signal 25% (8 mA) position confirm. 
 
 

Содержание 5951 00

Страница 1: ...italet de Llobregat Barcelona Spain genebre genebre es www genebre es GENEBRE S A UPDATE DATE 27 05 2021 UPDATE NUMBER 4 1 INSTALLATION OPERATION AND MAINTENANCE MANUAL Electro Pneumatic Positioner fo...

Страница 2: ...Storage Conditions 5 5 Preliminary Checks 5 6 Positioner Installation 5 6 1 Installation of the Support and the Positioner on the actuator 5 6 2 Mounting of the Cam 6 6 3 Air Connection 7 6 4 Electri...

Страница 3: ...r single effect actuators Easy setting of zero and of the trajectory Easy switching of direction clockwise counter clockwise Low air consumption and easy connection to air ducts 2 Data and Technical F...

Страница 4: ...must be familiar with all notices and warnings described in these instructions Not complying with these notices and warnings may cause serious personal injury and material damages Certain parts of the...

Страница 5: ...Avoid placing them straight on the floor Use pallets shelves o wood bases Genebre S A recommends to visually examine the possible damages suffered during transportation and storage Visual inspection m...

Страница 6: ...eaves the factory with the cam mounted on the shaft and the indicator plate in the position RA counter clockwise reverse acting In case you need to switch the direction clockwise direct acting proceed...

Страница 7: ...UPDATE NUMBER 4 7 Fix the cam using the upper nut so that the reference line 0 is tangent to the bearing Once the cam is mounted place and fix the indicator plate to the main shaft using the M3 screw...

Страница 8: ...uit completely to avoid strange particles 3 In applications with single effect actuator spring return close output OUT1 or OUT2 as appropriate 6 4 Electrical Connection transmission signal Connect the...

Страница 9: ...nsult the technical data sheet of the limit switch box art 5987 7 Breakdown view 8 Starting Up Settings Note The positioner leaves the factory set to position 0 and path 90 In case you need to establi...

Страница 10: ...signal of 0 4 mA and so that it stops at position 100 with an input signal of 100 20 mA respectively Check Zero point and repeat the Span setting as many times as required Once the equipment is set ti...

Страница 11: ...cillation due to mounting with a low air capacity actuator refer to section 8 5 8 5 Air throttle in pilot valve In case of low air capacity actuators there could be oscillation in the equipment render...

Страница 12: ...e signal sent 4 20 mA 8 6 1 Connect 24VDC power source series connect amperemeter convenient for observing the feedcack signal s current value Observe the value of the amperemeterr it must be between...

Страница 13: ...The valve locate in feedback 75 16 mA position Press the button or button adjust the current value then press the enter button Observe the amperemeter value if the amperemeter value jump from 16 mA to...

Страница 14: ...r flow hole located on the A M regulator to remove any particles that might be left inside Cleaning the A M Switch Finally clean the A M Switch regulator using air and place it back in the enclosure D...

Отзывы: