9.1.2 Initial commissioning with factory setting
(
when supplied with a mounted
motorized actuator
)
G
Connect the signal inputs (see chapter 5.2.1)
G
Connect the supply voltage (see chapter 5.1)
The GEMÜ 1283 is now ready for operation.
Example:
9.2
Use as a 3-point controller for process control
9.2.1 Initial commissioning without factory setting
(
when supplied without a
mounted motorized actuator
)
G
Carry out the mechanical mounting (see chapter 4)
G
Connect the signal inputs (see chapter 5.2.2 or 5.2.3)
G
Connect the supply voltage (see chapter 5.1)
The GEMÜ 1283 is now ready for operation.
9.2.2 Initial commissioning with factory setting
(
when supplied with a mounted
motorized actuator
)
G
Connect the signal inputs (see chapter 5.2.2 or 5.2.3)
G
Connect the supply voltage (see chapter 5.1)
The GEMÜ 1283 is now ready for operation.