background image

 

 

28 

GEMBIRD EUROPE B.V.     http://www.gembird.eu 

SIS-PMS  

PROGRAMMABLE SURGE PROTECTOR

 

Figure #16 

 

  To  remove  the  event,  select  it  and  click  the 

Remove

  button  (see 

Figure  #13  above).  You  can  select  multiple  events  using 

Ctrl

  and 

Shift

  keys.  You  can  also  remove  all  events  by  clicking  the 

Clear

 

button 

HINT:

  Use  the  popup  menu  which  can  be  activated  by  the  right 

mouse button click over the table. 

Содержание SIS-PMS

Страница 1: ...PROGRAMMABLE SURGE PROTECTOR PROGRAMMIERBARE STECKDOSENLEISTE PROGRAMMEERBARE STEKKERDOOS PARASURTENSEUR PROGRAMMABLE USER MANUAL HANDBUCH HANDLEIDING MANUEL DESCRIPTIF SIS PMS...

Страница 2: ...2 1 Side panel 7 2 2 Indicators 8 2 3 Audible signals 8 3 Installation 9 3 1 Getting started 9 3 2 Power Manager installation 10 4 Power Manager software 11 4 1 Managing SIS PMS 11 4 2 Setting up the...

Страница 3: ...pre program the unit event timer schedule hardware schedule and then disconnect SIS PMS from the managing computer The device can be used as an advanced standby killer 1 1 Features The main rocker swi...

Страница 4: ...hen I want to scan or switch my printer off whenever I exit Windows Real time Voltage monitor provides information about the actual status of each manageable socket on or off This information can be f...

Страница 5: ...roviding power is always present Otherwise there can be an additional up to 2 seconds error per each power off Working temperature range from 10 to 40 C Dimensions 378 x 98 x 55 mm Net weight 1 0 kg 1...

Страница 6: ...ors and controls of SIS PMS Figure 1 Main rocker switch Z Indicator Socket 3 Silence button to suppress beeps Indicator POWER Non manageable socket Indicator Socket 4 Indicator Socket 2 Indicator Sock...

Страница 7: ...7 GEMBIRD EUROPE B V http www gembird eu SIS PMS PROGRAMMABLE SURGE PROTECTOR 2 1 Side panel Figure 2 Circuit breaker Power cord...

Страница 8: ...heard after SIS PMS is successfully connected to the computer USB port after the self test Short beep will be heard by switching the manageable sockets on and off Continuous beeps hardware event sched...

Страница 9: ...hed on and off by means of the Main rocker switch Z Two the first and the last sockets of SIS PMS are marked with the symbol These two sockets are switched on and off by means of the Main rocker switc...

Страница 10: ...chedule will be able to turn the manageable sockets on and off To protect the connected devices from possible high current and short circuit SIS PMS is equipped with the automatic circuit breaker NOTE...

Страница 11: ...er Manager software is designed to support not only SIS PMS but also other products of SIS family After a successful installation a socket icon will appear in your system tray 4 1 Managing SIS PMS Dou...

Страница 12: ...dow of the main control panel shown on the Figure 4 below Figure 4 Double click over each socket will switch it on and off green color means the socket is switched off red color means the socket is sw...

Страница 13: ...13 GEMBIRD EUROPE B V http www gembird eu SIS PMS PROGRAMMABLE SURGE PROTECTOR Figure 5 You can choose a different device and another socket from the Device and Socket drop down list boxes...

Страница 14: ...from drop down list box Such icon is a fast way to switch the device connected to the socket on off or check the device status You can also assign a hot key to switch the socket on off Check the Switc...

Страница 15: ...PROGRAMMABLE SURGE PROTECTOR 4 2 Setting up the hardware schedule Using the Hardware schedule button available from the Settings window you can create the hardware timer schedule see Figure 6 below T...

Страница 16: ...ROTECTOR The window Add entry will appear see Figure 7 below In the dialog box specify the required time and the action Figure 7 To edit the record select it and click the Edit button or just double c...

Страница 17: ...ve You can select multiple entries using Ctrl and Shift keys You can also remove all entries from the schedule by clicking the Clear button see Figure 6 above To repeat your event for example if you w...

Страница 18: ...ed and an error message will appear Click the Apply button again after correcting all the errors Use Sync button see Figure 6 above to synchronize device timer with PC clock Note that after synchroniz...

Страница 19: ...ays NOTE If the device is powered off the hardware schedule is still in the device memory and will be resumed when the power supply is restored However the whole schedule will be then delayed with the...

Страница 20: ...g up the software schedule Using the Software schedule button available from the Settings window you can create the software timer schedule see Figure 10 below NOTE the software timer schedule will on...

Страница 21: ...ure 11 below Figure 11 In the Add task window check Switch ON time and or Switch OFF time checkboxes and specify the time to switch the socked on and or off If you want the same event to be performed...

Страница 22: ...URGE PROTECTOR uncheck the Enabled checkbox and to enable the task again re check the checkbox To edit the task select it see Figure 10 above and click the Edit button or just double click on the task...

Страница 23: ...by the right mouse button click over the table see Figure 10 above 4 4 Setting up application events Using the Application events window you can specify the socket events when a certain application is...

Страница 24: ...4 GEMBIRD EUROPE B V http www gembird eu SIS PMS PROGRAMMABLE SURGE PROTECTOR Figure 13 To add a new program event click the Add app button The Add program event dialog will appear see Figure 14 below...

Страница 25: ...ou can also select a shortcut to the application In this case the application title and path name will be taken automatically via the shortcut if possible After you have specified the application chec...

Страница 26: ...n for example switch your scanner on off whenever Photoshop is started closed To add a new file event click the Add folder button see Figure 13 above The Add file event window will appear see Figure 1...

Страница 27: ...specified file name mask is removed from the specified folder HINT Your device is an advanced standby killer Use the Add folder button to assign c system32 spool printers folder to switch your printe...

Страница 28: ...To remove the event select it and click the Remove button see Figure 13 above You can select multiple events using Ctrl and Shift keys You can also remove all events by clicking the Clear button HINT...

Страница 29: ...advanced features The following information is for advanced users which wish to have full access to the advanced features of SIS PMS Click the Advanced features button available from the Settings win...

Страница 30: ...blackout and will be resolved after power returns The Voltage alarm can also be triggered if for any reason a switching task could not be carried out switching malfunction Voltage alarms are accompani...

Страница 31: ...voltage alarm is triggered Check the When alarm goes off checkbox then click the Browse button to select the desired program to be launched after the alarm status see above is resolved 5 2 Setting up...

Страница 32: ...ss to the device via this PC To prevent unauthorized access to the device enter the access password in the field Password NOTE The port 6100 should be open Contact your LAN administrator for further d...

Страница 33: ...33 GEMBIRD EUROPE B V http www gembird eu SIS PMS PROGRAMMABLE SURGE PROTECTOR Figure 20 To add a new remote device press the Add button You will see the window Add network device see Figure 21 below...

Страница 34: ...the name of the target SIS PMS in the field Device name Enter access password in the field Password To disconnect from the device uncheck the option Enable set this option on again to regain the acces...

Страница 35: ...double click on the network device see Figure 20 above The Edit network device window will appear see Figure 22 below Figure 22 To remove the network device select it and click the Remove button see F...

Страница 36: ...ion Disable device beeper in the Advanced features window see Figure 17 above Another useful option available from the Advanced features window see Figure 17 above is the tuning of the device timer Sy...

Страница 37: ...r the correction value in seconds which will be applied every 24 hours and push OK button 5 4 Managing SIS PMS via your own software To let you switch the sockets from your own applications the follow...

Страница 38: ...o ini file in the Power Manager folder DeviceName the user specified device name Socket name where is replaced by a certain socket number the user specified socket name Socket SwitchState where is rep...

Страница 39: ...cators are not lit There is no power supply to the SIS PMS Please make sure the SIS PMS is connected to the power supply and the rocker switch is switched on Software reports Device I O request error...

Страница 40: ...40 GEMBIRD EUROPE B V http www gembird eu SIS PMS PROGRAMMABLE SURGE PROTECTOR...

Страница 41: ...lated on the baSIS of the current market value of the defective products Die Garantie betr gt 36 Monate ab Verkaufsdatum an den Endverbraucher Das Kaufdatum und der Ger tetyp sind durch eine maschinel...

Страница 42: ...tie doit num rer clairement la date d achat et le type d appareil Conservez le re u d achat pendant toute la dur e de la garantie car elle est n cessaire pour toute r clamation Au cours de la p riode...

Страница 43: ...______ 20____ _________________________________ ________________________________________________ _____________ _____________ 1 2 3 4 ____________________ __________________________ ___________________...

Отзывы: