C67
Correct installation, operation, servicing and
repair work ensure faultless diaphragm valve
operation.
The descriptions and instructions
apply to the standard versions.
For special versions not described
in these installation, operating
and maintenance instructions the
basic information contained herein
applies in combination with any
additional special documentation.
All rights including copyright
and industrial property rights are
expressly reserved.
2 General safety information
The safety information does not take into
account:
Unexpected incidents and events, which
may occur during installation, operation
and servicing.
Local safety regulations which must be
adhered to by the operator and by any
additional installation personnel.
2.1 Information for service
and operating personnel
The installation, operating and maintenance
instructions contain fundamental safety
information that must be observed during
commissioning, operation and servicing.
Non-compliance with these instructions may
cause:
Personal hazard due to electrical,
mechanical and chemical e
ff
ects.
Hazard to nearby equipment.
Failure of important valve functions.
Hazard to the environment due to the
leakage of dangerous materials.
Hazard to the process purity and / or the
process system safety.
1 General
information
Prerequisites to ensure that the GEMÜ valve
functions correctly:
Correct shipping and storage
Installation and commissioning by trained
personnel
Operation according to the installation,
operating and maintenance instructions
Recommended maintenance
Contents
1 General
information
20
2
General safety information
20
2.1
Information for service
and operating personnel
20
2.2 Warning
notes
21
2.3 Symbols
used
21
3 De
fi
nition of terms
22
4
Intended area of use
22
5
Scope of delivery
22
6 Technical
data
22
7 Order
data
28
8 Manufacturer’s
information 29
8.1 Transport
29
8.2
Delivery and performance
29
8.3 Storage
29
8.4 Tools
required
29
8.5
Opening the packaging
29
9 Functional
description
30
9.1
Type plate
30
10 Construction
30
11
Installation and operation
31
11.1 Installing the diaphragm valve
31
11.2 Operation
32
11.3 Setting the seal adjuster
33
11.4 Lock out device
34
12 Commissioning
34
13
Inspection and servicing
34
14 Disassembly
35
15 Disposal
35
16 Returns
35
17 Information
36
18 Troubleshooting
/
Fault clearance
36
19
EU Declaration of conformity 37
20 / 40
Содержание C67 CleanStar
Страница 38: ...C67 38 40 ...
Страница 39: ...C67 39 40 ...