Page 18
Société des Anciens Établissements L.GEISMAR
– Prohibited Reproduction ©
3 – 3
Fitment within loading gauges
When placing the machine on or taking it off the rails, it may exceed the loading gauge. Special
safety measures must be defined in agreement with the rail network operator prior to placing or
removing the
BRV on or off the rails.
Lower section: The
BRV
exceeds the temporary storage loading gauge (NF 58-002 Appendix D).
When passing over track equipment, the digger driver must raise the
BRV
.
Содержание BRV
Страница 2: ......
Страница 6: ......
Страница 17: ...Page 17 Société des Anciens Établissements L GEISMAR Prohibited Reproduction 3 2 Dimensions ...
Страница 22: ......
Страница 36: ......
Страница 42: ......
Страница 44: ......
Страница 46: ......
Страница 48: ......
Страница 49: ...Section A Mechanical Components ...
Страница 51: ......
Страница 53: ......
Страница 55: ......
Страница 57: ......
Страница 59: ......
Страница 61: ......
Страница 63: ......
Страница 65: ......
Страница 67: ......
Страница 69: ......
Страница 70: ......
Страница 71: ...Section B Hydraulic Components ...
Страница 73: ......
Страница 75: ......
Страница 76: ......
Страница 77: ......
Страница 79: ......
Страница 81: ......
Страница 83: ......
Страница 84: ......
Страница 85: ...Optional Components ...
Страница 87: ......
Страница 89: ......
Страница 91: ......
Страница 93: ......
Страница 94: ......