background image

 
 

ЗАПОЛНЯЕТСЯ

 

УСТАНОВЩИКОМ

Дата

 

установки

: _____________________________________ 

Дата

 

замены

: _______________________________________ 

Место

 

установки

: ____________________________________ 

Заводской

 

номер

 

устройства

__________________________ 

(

находится

 

на

 

внутренней

 

стороне

 

пластмассового

 

корпуса

Печать

 

Подпись

___________________________________________ 

  
TO COMPILE BY THE INSTALLER 
 
Installation date _____________________________________ 

Substitution date ____________________________________ 

Installation local _____________________________________ 

Instruments’ serial number _____________________________ 

(to read on the internal part of the plastic involucres) 

 

Stamp 

 

Sign ______________________________________________ 

Содержание 654-O/G

Страница 1: ...supply Gas detected 654 O M 230 12 Methane 654 O G 230 12 LPG 656C M 230 12 Methane 656C G 230 12 LPG GAMMA 654 O M GAMMA 654 O G GAMMA 656C M 656C G GAMMA 654 O M GAMMA 654 O G GAMMA 656C M GAMMA 65...

Страница 2: ...to be put out of order or re send to Geca S r l for a complete substitution of the device With that aim for this purpose on the cover you will find a label on which have to be indicated the maturity...

Страница 3: ...n the heating phase During this time all the detection functions will be inhibited GAMMA 654 O M GAMMA 656C M 30 GAMMA654 O G GAMMA 656C G 30 1 4 METHANE Detector L P G Detector INSTALLATION Attention...

Страница 4: ...g Directly over the sink or the gas device In little locals where can be utilised alcohol ammonia spray bottles of gas or other substances with flying solvents In low ventilated environments Near to w...

Страница 5: ...M GAMMA 652C G GAMMA 652 O M GAMMA 652 O G 3 5 6 REMOTE CONNECTION The central unit has two clamps 5 6 active in closeness to be connected with an remote sensor GAMMA 656C M or with GAMMA 656C G or w...

Страница 6: ...LVE 4 OPERATIONAL WITH NORMALLY CLOSED VALVE ELECTRICAL CONNECTION WITH MORE THEN ONE CENTRAL UNITS The following plans mentioned shows the connection in between two central units with an single elect...

Страница 7: ...MA 656C G OPERATING CONTROLS After the installation it is possible to check the correct use of the instrument by pushing for at least 2 seconds the TEST button on the GAMMA 654 O M or GAMMA 654 O G bo...

Страница 8: ...rms We recommend to ventilate the room where products like these can be used Note that the detector is not able to detect gas leaking outside the room where it is installed neither inside walls or und...

Страница 9: ...not apparent and or cannot be corrected vacate the premises and immediately notify the gas emergency service 230 50 12 2 5 20 10 C 40 C 30 90 10 1 GAMMA 654 O 20 85 A 1 IP42 GAMMA 654 O TECHNICAL CHA...

Страница 10: ...__________ TO COMPILE BY THE INSTALLER Installation date _____________________________________ Substitution date ____________________________________ Installation local _______________________________...

Страница 11: ...chase date Any damages caused by tampering and incorrect use or installation will be not covered by warranty The warranty is valid only if is full compiled In case of defects covered by warranty the p...

Страница 12: ...srl it 0134108 2 710 1509 GECAs r l GECA S r l reserves the right to make any aesthetic or functional modification to the without prior notice at any time WARRANTY CERTIFICATE TO COMPILE AND SEND IN C...

Отзывы: