
GEAX
s.r.l.
Chapter 2
TRANSPORTING THE DRILLING RIG
1
Chapter 2
TRANSPORTING THE DRILLING RIG
2.1 Operations preparing transportation
2.1.1
Removing the tool
The auger tool (two parts + the tip) can only be disassembled with the mast
upright. Disassemble the tip, the lower part and then the upper part.
Proceed as follows to disassemble the tip:
Lower the tool to the ground.
Disassemble the centring device using the winch 2° to handle the parts
(70 kg.)
fig. 2.2.3.1
.
Hook the tip to the rope of the secondary winch.
Command a slight tensioning of the rope.
Loosen the recessed safety bolt and slip the pin off.
Lift the rotary so that the joint slips off and the tip remains hanging on
the rope of the winch.
Move the rope of the secondary winch down.
Place the tip on the ground and move it.
Proceed as follows to disassemble the central part of the auger
fig.2.1.1.1
:
Lower the tool to the ground.
Lean the ladder against the mast.
When a second operator at the base guarantees the stability of the
ladder by holding it with both hands, climb up to the height of the joint
and secure the safety belts to the eyebolt on the mast.