9
PREPARATION FOR USE
Figure 2-1 (3-Point Hitch Points)
Top Link Hitch Point
Lift Arms
Hitch Pins
Figure 2-2
H.
Hold driveline sections parallel to each
other and check for a minimum of 6"
(15cm) overlap. (Figure 2-3). If driveline
has been marked for cutting, overlap will
be the distance between two marks. If
driveline has less than minimum overlap, do
not use. Contact authorized dealer.
Figure 2-3
NOTE:
If driveline is the correct length, omit the following
steps "I" through "L" and proceed to step "M".
I.
Clamp driveline in a well padded vice to
prevent damage to the shield. Cut off shield
where marked. (Figure 2-4)
Figure 2-4
J.
Using cut off section of shield as a guide, cut
shaft the same amount. (Figure 2-5)
K.
Repeat steps "I" and "J" to other driveline
section.
Figure 2-5
L.
Deburr ends of driveline sections and clean
away all chips and fillings. (Figure 2-6)
M.
Apply multi-purpose grease to inside of
outer (female) driveline section. Assemble
driveline and install on tractor and rotary
mower. Pull on each driveline section to be
sure yokes lock into place. Make certain
driveline shielding is in place and in good
condition.
Figure 2-6
N.
Adjust lower lift arm(s) to level rotary
mower right to lift. Refer to tractor operator's
manual for instructions.
NOTE:
After attaching driveline to tractor, attach driveline
shield chains from both ends of driveline shielding to
stationary locations.
Minimum
Overlap
Содержание & RC30-84
Страница 17: ...15 TORQUE SPECIFICATIONS...