•
Disconnect all power and utility lines.
•
Markings, e.g. on lines, must not be removed.
•
Do not climb on the component. Use suitable access aids and working
platforms.
•
Mark the lines (if unmarked) prior to disassembly to ensure they are not
confused when re-assembling.
•
Protect open line ends with blind plugs against ingress of dirt.
•
Pack sensitive parts separately.
•
For longer periods of standstill, observe the storage conditions, see
Section 4.1, Page 21.
10.2
Inspections
Between the maintenance periods, the valves must be checked for leakage and
proper function.
10.2.1 Product contact seals
Carry out the following steps:
1.
Regularly check:
–
Sealing ring between upper housing and lantern
–
V-ring in the valve disks
®
Done
10.2.2 Pneumatic connections
Carry out the following steps:
1.
Check the operating pressure at the pressure reducing and filter station.
2.
Regularly clean the air filter in the filter station.
3.
Check that the air hoses sit firmly in the air connections.
4.
Check the lines for kinks and leaks.
5.
Check the solenoid valves for proper function.
®
Done
10.2.3 Electrical connections
Carry out the following steps:
1.
Check that the union nut on the cable gland is tight
2.
Check that the cable connections are firmly secured.
3.
Check the solenoid valves for proper function.
4.
Check that the proximity switch connections are clean.
®
Done
Maintenance
Inspections
430BAL013059EN_7
24.03.2022
37
Содержание VARIVENT FRS
Страница 65: ...14 Dimension sheet Valve FRS Fig 31 Dimension sheet Valve FRS 430BAL013059EN_7 24 03 2022 65...
Страница 69: ...Appendix 430BAL013059EN_7 24 03 2022 69...
Страница 70: ......