Maintenance
Scheduled maintenance responsibilities
2010-9015-017
04-2015
10.3
Scheduled maintenance responsibilities
10.3.1 GEA Farm Technologies Canada Inc. / Division GEA Houle maintenance schedule
Task
Before
each working day
After each working day
Every 5 hours of operation
Every 10 hours of operation
If needed
Action by
Visual inspection
X
Trained
personnel
Check oil level in oil bath (optional)
X
Check oil level in oil tank
X
Grease the PTO driveline
X
Grease the swivel hitch
X
X
Grease driving shaft bearings
X
X
Grease undercarriage pivot points
X
Grease bearing housing
X
X
Clean the equipment
X
Replace propeller knife
X
Attention!
When operating this GEA Houle product using other manufacturer's components
and/or products such as a PTO, a tractor, a motor, a pump, etc., ALWAYS perform
maintenance of the component and/or product as recommended by its
manufacturer.
Содержание Lagoon Agitator
Страница 34: ...Initial commissioning Initial commissioning checklist 2010 9015 017 04 2015 34 64 ...
Страница 36: ...Initial commissioning Initial commissioning checklist 2010 9015 017 04 2015 36 64 ...
Страница 49: ...Operating Removing the agitator 2010 9015 017 04 2015 49 64 Install the PTO 1 on transportation support 1 ...
Страница 63: ...Appendix Hydraulic diagrams 2010 9015 017 04 2015 63 64 ...