
– 10 –
Removal and Replacement
Remove PCB Assembly
1. Open lid and insert small screwdriver blade
into notch in each of 2 screw covers. Push
blade in and pull handle down to remove
covers.
2. Remove 2 screws.
3. Lift back of control panel while sliding panel
forward. Lift panel and turn it over.
4. Remove 3 screws and PCB from the control
panel.
5. Disconnect 7 connectors from PCB and
remove PCB.
Remove Top Cover
WARNING: The exposed electrical connector
for the unbalance switch carries 120 volts.
Be sure power to washer is disconnected before
removing rear top cover. Failure to comply can
cause injury or death.
1. Remove control panel.
2. Remove 2 screws from front of main top
cover.
3. Remove 2 screws from back of rear top
cover.
4. Lift rear top cover from back and push forward
to remove.
5. Remove 4 terminal connectors, pressure
sensor hose, and main top cover from
washer.
Pressure Sensor
1. Remove rear top cover.
2. Disconnect pressure sensor wire harness
connector.
3. Release pressure on three clips while pulling
pressure sensor in upward direction.
4. Loosen hose clip and remove pressure sensor
from hose.
GEA00159
Clips
Hose
Screw
Sponge-Harness
GEA00140
Cover-screw
Screw
FRIA
CALIENTE
MEDIO
BAJO
MINIMO
ALT
O
CICLO
NIVEL AGUA
SUM
INIST
RO
DEAGUA
FUNCION
REMOJAR
ECO
LANA
FUZZY
LAVAR
TIEMPO REST
ANT
E
MI
N
ENJUAGAR
CENTRIFUGAR
INICIO
PAUSA
ENCENDIDO
GEA00139
Screw
Screw
Rear Top
Main Top
Cover
GEA00142