GE Multilin
L60 Line Phase Comparison System
7-7
7 COMMANDS AND TARGETS
7.2 TARGETS
7
•
How often the test is performed
: Event driven. The test is performed when a device programmed to receive GOOSE
messages stops receiving. This can be from 1 to 60 seconds, depending on GOOSE packets.
•
What to do
: Check GOOSE setup.
•
Latched target message
: Yes.
•
Description of problem
: Abnormal restart from modules being removed or inserted while the L60 is powered-up, when
there is an abnormal DC supply, or as a result of internal relay failure.
•
How often the test is performed
: Event driven.
•
What to do
: Contact the factory.
UNEXPECTED RESTART:
Press “RESET” key
Содержание UR series
Страница 2: ......
Страница 4: ......
Страница 12: ...xii L60 Line Phase Comparison System GE Multilin TABLE OF CONTENTS ...
Страница 32: ...1 20 L60 Line Phase Comparison System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Страница 54: ...2 22 L60 Line Phase Comparison System GE Multilin 2 2 SPECIFICATIONS 2 PRODUCT DESCRIPTION 2 ...
Страница 132: ...4 30 L60 Line Phase Comparison System GE Multilin 4 3 FACEPLATE INTERFACE 4 HUMAN INTERFACES 4 ...
Страница 438: ...7 8 L60 Line Phase Comparison System GE Multilin 7 2 TARGETS 7 COMMANDS AND TARGETS 7 ...
Страница 478: ...8 40 L60 Line Phase Comparison System GE Multilin 8 3 FAULT LOCATOR 8 THEORY OF OPERATION 8 ...
Страница 502: ...A 10 L60 Line Phase Comparison System GE Multilin A 1 PARAMETER LIST APPENDIXA A ...
Страница 584: ...B 82 L60 Line Phase Comparison System GE Multilin B 4 MEMORY MAPPING APPENDIXB B ...
Страница 622: ...D 10 L60 Line Phase Comparison System GE Multilin D 1 PROTOCOL APPENDIXD D ...
Страница 634: ...E 12 L60 Line Phase Comparison System GE Multilin E 2 DNP POINT LISTS APPENDIXE E ...
Страница 642: ...F 8 L60 Line Phase Comparison System GE Multilin F 3 WARRANTY APPENDIXF F ...