10-
2
SPM Synchronous Motor Protection & Control
GE Power Management
10.2 COLLECTOR-RING MOTOR FIELD APPLICATION TEST
10 FUNCTIONAL TESTS
10
10.2 COLLECTOR-RING MOTOR FIELD APPLICATION TEST
10.2.1 SETUP
1.
Connect the Va and Vb terminals of the 3-phase tester to SPM terminals B9 and B10 (control power and
PF voltage reference) respectively. Program for 120 V AC.
2.
Connect the Switch to terminals A11 and A12 of the SPM (MX input). Close switch.
3.
Connect the function generator's output (AC sinewave 5 to 10 V) to the VF terminals A18 and A19. Set to
60 Hz.
4.
Connect multimeters to TRIP, FAR and FCX relay outputs to monitor relay status. Note: a timer may be
hooked up to start on FAR relay closure and stop on FCX closure to check timing.
10.2.2 RELAY PROGRAMMING
a) CONFIGURATIONS
Program as defaults shown in Section 5.4: CONFIGURATIONS MENU on page 5–12 except for following
exceptions
•
MOTOR: Collr-Ring
b) SETPOINTS
Program as defaults shown in 5.2: SETPOINTS MENU on page 5–2.
10.2.3 TEST
1.
Apply control power to relay and wait for self-test diagnostic to complete. Should get SPM READY mes-
sage and TRIP relay should close.
2.
Set function generator to 60 Hz and turn on.
3.
Open MX switch
4.
Lower frequency to 5 Hz: Relay should not apply field.
5.
Lower frequency to just under 3 Hz (5% of 60 Hz). FAR contact should close followed by FCX contact 1
second later. FIELD IS APPLIED message should momentarily flash on screen.
Table 10–1: COLLECTOR-RING MOTOR FIELD TEST RESULTS
SETPOINTS
INPUT/EXPECTED
RESULTS
SLIP
FCX TIME
FREQUENCY
FAR OPERATION
FAR OPERATION
FCX TIME
5%
1
5 Hz
open
5%
1
3 Hz
close
10%
5
10 Hz
open
10%
5
6 Hz
close
Содержание SPM
Страница 2: ......
Страница 4: ......
Страница 10: ...vi SPM Synchronous Motor Protection Control GE Power Management TABLE OF CONTENTS ...
Страница 74: ...6 4 SPM Synchronous Motor Protection Control GE Power Management 6 2 STATUS 6 ACTUAL VALUES 6 ...
Страница 96: ...8 6 SPM Synchronous Motor Protection Control GE Power Management 8 3 DC CURRENT TRANSFORMER 8 ACCESSORIES 8 ...
Страница 120: ...C 2 SPM Synchronous Motor Protection Control GE Power Management C 1 WARRANTY APPENDIXC C ...
Страница 124: ...iv SPM Synchronous Motor Protection Control GE Power Management INDEX ...
Страница 125: ...GE Power Management SPM Synchronous Motor Protection Control NOTES ...