C1 - 01 - Cover Sheet
C2 - 02 - Disclaimer - Site Readiness
A1 - 03 - 

General Notes

A2 - 04 - Equipment Layout
A3 - 05 - Section Views
A4 - 06 - Acoustic - Proximity Limits
A5 - 07 - RF Shielding
A6 - 08 - Equipment Dimensions (1)
A7 - 09 - Equipment Dimensions (2)
A8 - 10 - Delivery
S1 - 11 - Structural Notes
S2 - 12 - Structural Layout

S3 - 13 - Structural Details
M1 - 14 - Mechanical Layout
M2 - 15 - HVAC - Venting
M3 - 16 - Chilled Water
M4 - 17 - Cryogenics (1)
M5 - 18 - Cryogenics (2)
E1 - 19 - Electrical Notes
E2 - 20 - Electrical Layout
E3 - 21 - Electrical Elevation
E4 - 22 - Electrical Details
E5 - 23 - Power Requirements
E6 - 24 - Interconnections

----

----

SIGNA EXPLORER /SIGNA CREATOR

PMM

GE Healthcare

GE does not take responsibility for any damages resulting from changes on drawings made by others. Errors may occur by not referring to the complete

set  of  final  issue  drawing.  GE  cannot  accept  responsibility  for  any  damage  due  to  the  partial  use  of  GE  final  issue  drawings,  however  caused.  All

dimensions are in millimeters unless otherwise specified. Do not scale from printed pdf files. GE accepts no responsibility or liability for defective work

due to scaling from these drawings.

/24

EN-MRI-TYP-SIGNA_EXPLORER-WEB.DWG

----

----

PMM

5538857-1EN

----

1/4"=1'-0"

----

03/Aug/2018

Typical

A mandatory component of this drawing set is the GE Healthcare Pre Installation manual. Failure to reference the Pre Installation manual will result in

incomplete documentation required for site design and preparation.

Pre Installation documents for GE Healthcare products can be accessed on the web at: 

www.gehealthcare.com/siteplanning

-

Drawn by

Verified by

PIM Manual

Sheet

Format

Concession

Scale

Date

File Name

Rev

S.O. (GON)

A3

8

REV

DATE

MODIFICATIONS

A

10/Jul/2018

First issue drawing / Final study based on MRI-

FINAL STUDY

01

Содержание SIGNA CREATOR

Страница 1: ...omplete set of final issue drawing GE cannot accept responsibility for any damage due to the partial use of GE final issue drawings however caused All dimensions are in millimeters unless otherwise specified Do not scale from printed pdf files GE accepts no responsibility or liability for defective work due to scaling from these drawings 24 EN MRI TYP SIGNA_EXPLORER WEB DWG PMM 5538857 1EN 1 4 1 0...

Страница 2: ...plicable Power for MR compressor Chiller is available Ensure cryogen venting system is available for magnet connection Exhaust fan system is installed and operational per GE requirements Status of work General comments System can be delivered PMI signature Site ready for installation FS signature optional GLOBAL SITE READINESS CHECKLIST DI DOC1809666 Rev 5 GENERAL SPECIFICATIONS GE is not responsi...

Страница 3: ...ined to the magnet room If not possible a barrier is recommended to prevent entry to the 5g field area 2 The spaces around above and below the magnet must be reviewed for effects of the 5g 3g 1g and 5g fields Refer to the proximity limit chart in the MR pre installation manual referenced on the cover sheet 3 For moving metal the restriction lines typically extend outside of the MR space Please con...

Страница 4: ... contingent on a 72 in corridor width C 26 Minimum opening for is 43 in w x 82 in h contingent on a 96 in corridor width C 27 Counter top for equipment provide grommeted openings as required to route cables C 28 Base cabinet for storage of surface coils patient positioning pads phantoms etc C 29 Magnet access 9 0 x10 0 C 30 Shelf LEGEND A GE Supplied C Customer contractor supplied and installed B ...

Страница 5: ...Define RF shield s inset according to provisions made by the RF Shield vendor Warning 5 Gauss line outside the Magnet room limits MAGNET ROOM CONTROL ROOM FRONT VIEW WITH MAGNETIC FIELD 6 4 3 2 1 1 3 14 MAGNET ROOM Note Define RF shield s inset according to provisions made by the RF Shield vendor Warning 5 Gauss line outside the Magnet room limits 8 9 TBD TBD 8 9 TBD TBD 3 6 3 6 8 9 8 9 ...

Страница 6: ...gency generators Commercial laundry equipment Food preparation area Water cooling equipment HVAC equipment Major mechanical equipment room Credit cards watches and clocks Air conditioning equipment Fuel storage tanks Motors greater than 5 horsepower 50 gauss 5mT Metal detector for screening LCD panels Telephones No Limit Digital Detectors SOUND PRESSURE SPECTRAL DISTRIBUTION 20 25 31 5 40 50 63 80...

Страница 7: ...inet cover is adjustable between 100 200mm 4 8 in D PP cover is adjustable between 300 400mm 11 8 15 7 in SYSTEM CABINET Top View PENETRATION PANEL Top View D D PENETRATION PANEL Front View Cut out center line RF Shield Finished wall cut out Finished wall RF Shield 125 10 0 5 in 0 in 0 in 1000 0 30 39 in 0 in 1 in 50 10 0 2 in 0 in 0 in 625 10 0 25 in 0 in 0 in 550 10 0 22 in 0 in 0 in 25 10 0 1 i...

Страница 8: ...20 4 in 401 15 79 in 750 29 52 in 700 27 56 in 377 14 84 in 330 12 98 in 208 8 19 in GLOBAL OPERATOR CABINET GOC Center of Gravity SCALE 1 10 TOP VIEW FRONT VIEW SIDE VIEW 300 11 8 in PENETRATION PANEL SIDE VIEW FRONT VIEW SIDE VIEW FRONT VIEW Cover Cover SCALE 1 10 250 9 8 in 300 11 8 in 300 11 8 in 244 9 6 in SYSTEM CABINET Center of gravity SIDE VIEW FRONT VIEW TOP VIEW Air flow 482 19 in 1100 ...

Страница 9: ...gravity GAS SUPPLY RETURN WATER OUT IN 232 9 13 in 450 17 72 in 103 4 06 in 276 10 87 in 153 6 02 in 450 17 72 in 800 31 5 in 153 6 02 in 153 6 02 in BLOWER BOX A Air in take clearance B Duct trim cover TOP VIEW FRONT VIEW SIDE VIEW Air flow A B B 381 15 in 280 11 in 381 15 in 102 4 in TOP VIEW SIDE VIEW FRONT VIEW SCALE 1 25 LOW HEIGHT PATIENT TRANSPORT TABLE FIX 2134 84 in 127 5 in Date Rev 24 E...

Страница 10: ... ROUTING Floor must be able to withstand a moving load of 5320 daN Minimum Opening Height 2 5m 98 5 in width 2 5m 98 5 in Maximum slope 30 degree STRAIGHT PATH Rigging wheels required PATH WITH 90 DEGREE TURN INSTALLATION AND DELIVERY ACCEPTANCE A survey of the site established by the customer and GE Healthcare will make the decision for the delivery time This survey of the site a form is made ava...

Страница 11: ...r safety all removable items within the magnet room such as faucet handles drain covers switch box cover plates light fixture components mounting screws etc Must be non magnetic If you have a specific question about material bring it to the attention of your GE project manager of installations Floor levelness refer to MAGNET ROOM FLOOR SPECIFICATIONS DETAIL this floor levelness requirement is impo...

Страница 12: ...ing 4 Structural wall backing for Magnet Rundown Unit 5 Structural wall backing for Main Disconnect Panel 6 Structural wall backing for Magnet Monitor 7 Floor levelness area for Systems Cabinet Date Rev 24 EN MRI TYP SIGNA_EXPLORER WEB DWG A 03 Aug 2018 SIGNA EXPLORER SIGNA CREATOR Typical S2 Structural Layout 12 MAGNET ROOM EQUIPMENT ROOM CONTROL ROOM 5 4 3 1 1 1 1 7 2 6 0 9 4 11 6 6 4 8 10 6 6 8...

Страница 13: ...nded to the structural elements and not to common screed for magnet anchoring table dock anchor hole VibroAcoustic Pad weight 8 kg 17 lbs each Seismic anchor holes 1346 53 in 673 26 5 in 250 9 8 in 175 6 9 in 1354 53 3 in 76 3 in PATIENT TABLE DOCK ANCHOR MOUNTING REQUIREMENTS The RF Shield vendor must design and install the dock anchor bolt The dock anchor hole must be drilled after the Magnet is...

Страница 14: ...e supplied and installed by the customer or his contractors For complete design and requirements specifications and guidelines refer to the pre installation manual system cooling cryogen venting waveguides and exhaust venting An emergency water cooling back up supply is recommended for continuous cryogen compressor operation if using an open loop back up design ensure a drain is provided please re...

Страница 15: ...Exhaust Intake Vent MAGNET ROOM CONTROL ROOM RF Filter ON OFF Manual fan switches in parallel Ductwork Ductwork MAGNET ROOM VENTING REQUIREMENTS HVAC VENT REQUIREMENTS HVAC vendor must comply with Magnet room temperature and humidity specifications and RF shielding specifications RF Shield vendor must install open pipe or honeycomb HVAC waveguides All serviceable parts in the Magnet room e g diffu...

Страница 16: ...low 30 l min 8 gpm Temperature rise at maximum flow Temperature rise at minimum flow Maximum inlet pressure of Chiller Cryo Compressor 690 kPa 100 psi Minimum inlet pressure of Chiller Cryo Compressor 200 kPa 29 psi Minimum continuous heat load 7 5 kW pH level 6 5 to 8 2 Total hardness Less than 200 ppm of calcium carbonate Suspended matter Less than 10 mg per liter and less than 150 micron partic...

Страница 17: ... PIPE DETAIL MAGNET VENT ADAPTER Do not remove or modify the vent adaptor bolted to the magnet VENT PIPE 610 mm 24 in may be cut to a minimum of 100 mm 4 in VENTGLAS CONNECTOR WAVEGUIDE Additional pipe tubing 0 5 in mesh DIELECTRIC BREAK CRYOGENIC VENTING EXTERIOR GROUND VENT CAP customer supplied OUTSIDE WALL ROOF VENT CAP customer supplied NOT TO SCALE EXHAUST AREA 6 1m x 4 6m 20ft x 15ft LxW EX...

Страница 18: ...7 10 63 4 52 31 17 8 22 56 68 2 26 15 58 4 11 28 34 10 in 250mm 0 20 0 6 1 0 03 0 68 0 55 3 79 0 82 5 65 0 27 1 86 0 04 2 83 20 40 6 1 12 2 0 07 1 58 0 82 5 65 1 51 10 41 0 41 2 83 0 75 5 17 40 60 12 2 18 3 0 10 2 26 1 23 8 48 2 19 15 10 0 62 4 27 1 10 7 58 60 80 18 3 24 4 0 12 2 71 1 51 10 41 2 74 18 89 0 75 5 17 1 37 9 45 80 100 24 4 30 5 0 16 3 62 1 92 13 24 3 43 23 65 0 96 6 62 1 71 11 79 12 i...

Страница 19: ...un direct as possible otherwise may result in the need for greater than standard cable lengths refer to the interconnection diagram for maximum usable lengths point to point 8 Conduit turns to have large sweeping bends with minimum radius in accordance with national and local electrical codes 9 A special grounding system is required in all procedure rooms by some national and local codes It is rec...

Страница 20: ...lephone lines network connection Duplex hospital grade dedicated outlet 120 v emergency single phase power 15a Duplex hospital grade dedicated outlet 120 v single phase outlet routed through RF filter Additional Conduit Runs Contractor Supplied and Installed From To Qty Size in Size mm Main Disconnect Panel Facility power 1 as Req d Main Disconnect Panel Power Distribution Unit inside Systems Cabi...

Страница 21: ...YP SIGNA_EXPLORER WEB DWG A 03 Aug 2018 SIGNA EXPLORER SIGNA CREATOR Typical E3 Electrical Elevations 21 MAGNET ROOM EQUIPMENT ROOM 8 9 TBD TBD 5 4 7 9 9 8 CONTROL ROOM 5 4 3 2 TBD TBD TBD TBD TBD TBD 7 4 9 0 7 6 4 5 0 11 7 6 4 ...

Страница 22: ...N THE FLOOR NOT TO SCALE Removable coverplate DUCT ON THE WALL Date Rev 24 EN MRI TYP SIGNA_EXPLORER WEB DWG A 03 Aug 2018 SIGNA EXPLORER SIGNA CREATOR Typical E4 Electrical Details 22 CABLE MANAGEMENT Removable coverplate WALL DUCT NOT TO SCALE ...

Страница 23: ...TE EMERGENCY OFF BUTTONS ARE SUPPLIED WITH GE MDP OPTION EMERGENCY OFF BUTTONS ARE CUSTOMER SUPPLIED IF GE MDP OPTION NOT USED CIRCUIT BREAKERS ARE PROVIDED FOR PDU CRYO COOLER COMPRESSOR CHILLER GRADIENT CHILLER SHIELD CRYO COOLER COMPRESSOR CABINET MAGNET MONITOR EQUIPMENT CIRCUITS ALL BRANCH CIRCUITS DROP OUT ON LOSS OF POWER COLDHEAD MRCC GRADIENT MRCC SHIELD CRYO COOLER COMPRESSOR CABINET MAG...

Страница 24: ...15 75m 13 94 51 67 ft 17 98 m 59 ft 9 56 m 31 ft 12 5 m 41 ft 12 8m 42 ft 17 4m 57 ft 2 55 16 13m 8 35 52 9 ft 12 2m 40 ft 21 00 m 68 ft 4 3 11 3m 14 1 37 1 ft GOC MAGNET ROOM CONTROL ROOM EQUIPMENT ROOM MRU SC MG6 WC1 CRY MON WC2 PP RF CGS MAG PED PT1 System power panel MDP or PDB SEO2 SEO1 DS Customer supplied 24 m 78 7 ft Date Rev 24 EN MRI TYP SIGNA_EXPLORER WEB DWG A 03 Aug 2018 SIGNA EXPLORE...

Отзывы: