Page 49
XI. SPECIAL EDITION ON MAINTENANCE OF ENVIRONMENTAL PROTECTION
REFRIGERATOR
iii. Operational Sequence
a.
Vacuum pump starts to
operate (to be stopped until
finishing the vacuum
extraction till to Point 13).
b.
Open VB valve first and then
open LB, HB valves.
LB
VB
HB
1 2
3
L
H
Open the valves by 1-2-3 sequence
c.
Vacuum extraction (5 minutes)
d.
After extracting vacuum for 5
minutes, close HB, VB valves
and leave LB valve open.
HB
L
H
VB
e.
Open CB valve and let 50g of
freon enter the freezing system
from LB side, the low pressure
gauge be kept at 3-4 kgf/cm
2
of pressure at this time.
f.
Close both CB and LB valves.
g.
Loosen the nut of connection
point A to discharge the air.
Confirm the balance of high,
low pressures.
Valve Regulation
L
H
CB
LB
L
H
CB
LB
L
H
A
Содержание PTV15SAMR
Страница 53: ...Page53 XII PART LIST AND EXPLODED VIEW PTV15SAMR PTU427SAMR PTQ440SAMR PTG440SAMR...
Страница 54: ...Page54 XII PART LIST AND EXPLODED VIEW PTV15SAMR PTU427SAMR PTQ440SAMR PTG440SAMR...
Страница 61: ...Page61 XII PART LIST AND EXPLODED VIEW PTV16SAMR PTU463SAMR PTQ470SAMR PTG470SAMR...
Страница 62: ...Page62 XII PART LIST AND EXPLODED VIEW PTV16SAMR PTU463SAMR PTQ470SAMR PTG470SAMR...
Страница 70: ...Page70 XII PART LIST AND EXPLODED VIEW PTV19SAMR PTU527SAMR PTQ530SAMR PTG530SAMR...
Страница 71: ...Page71 XII PART LIST AND EXPLODED VIEW PTV19SAMR PTU527SAMR PTQ530SAMR PTG530SAMR...
Страница 78: ...Page78 XII PART LIST AND EXPLODED VIEW PTV20SAMR PTU565SAMR PTQ570SAMR PTG570SANR...
Страница 79: ...Page79 XII PART LIST AND EXPLODED VIEW PTV20SAMR PTU565SAMR PTQ570SAMR PTG570SANR...