– 31 –
12. Install the process valve (part # WJ56X61).
Clean and inspect all joints.
13. Evacuate and charge the system. Use original
factory charge quantity of R-134a. (See
Evacuation and Charging Procedure
.)
14. Reinstall the rear access cover.
Jumper Tube
9. Angle the torch so the fl ame is not directed
towards the valve body when brazing the
three joints.
10. Remove the thermal paste residue and dry
the valve body thoroughly. Install the valve
body into the coil.
Note:
If necessary, use an adjustable pliers to
carefully install the valve body into the coil. DO
NOT depress on the top of the valve body. See
photo.
Freezer Evaporator
The following components must be removed
in the appropriate order to access the freezer
evaporator:
1. Remove the ice bucket, shelves, and drawers.
2. Slide the air duct panel upward to remove.
Disconnect
3. Remove the light bulb cover and light bulbs.
4. Remove the four
1
/
4
-in. hex-head screws that
hold the auger assembly in place.
5. The auger motor wiring is connected in two
places:
a. Disconnect the top connector.
11. Remove the old drier by un-brazing or
cutting the condenser loop (halo) as close
as possible to the drier. Install the new drier
assembly (part # WR86X93).
Note
: If necessary, use the condenser loop
extension tubing (part # WR97X238).
b. Pull the auger motor assembly forward
and disconnect the second connector.
Disconnect
Содержание PSH23PGR Series
Страница 15: ... 15 Freezer Section Cooling Condenser Fan Running Fresh Food Fan Off Freezer Fan Running ...
Страница 16: ... 16 Fresh Food and Freezer Section Cooling Condenser Fan Running Fresh Food Running Freezer Fan Running ...
Страница 44: ... 44 Illustrated Parts ...
Страница 45: ... 45 ...
Страница 46: ... 46 ...
Страница 47: ... 47 ...
Страница 48: ... 48 ...
Страница 49: ... 49 ...
Страница 50: ... 50 ...
Страница 51: ... 51 ...
Страница 52: ... 52 ...
Страница 53: ... 53 ...