– 44 –
12. Install the process valve (part # WJ56X61). Clean
and inspect all joints.
13. Evacuate and charge the system. Use original
factory charge quantity of R-134a. (See
Evacuation and Charging Procedure
.)
14. Reinstall the rear access cover.
Jumper Tube
9. Angle the torch so the fl ame is not directed
towards the valve body when brazing the three
joints.
10. Remove the thermal paste residue and dry the
valve body thoroughly. Install the valve body
into the coil.
Note:
If necessary, use an adjustable pliers to
carefully install the valve body into the coil. DO NOT
depress on the top of the valve body. See photo.
11
.
Remove the old drier by unbrazing or cutting
the condenser loop (halo) as close as possible to
the drier. Install the new drier assembly (part #
WR86X93).
Note
: If necessary, use the condenser loop
extension tubing (part # WR97X238).
CustomCool™ Assembly
Note:
Refer to Service Guide #31-9075 for complete
instruction on servicing CustomCool™ components.
The following components must be removed in
the appropriate order to access the CustomCool
assembly.
Remove the 2 bottom freezer baskets.
Remove the recessed Phillips-head screw that
attaches the CustomCool inlet. Pull the inlet out
of the freezer wall.
1.
2.
Access the fresh food evaporator. (See
Fresh
Food Evaporator
, follow steps 1 through 6.)
Carefully lift and pull the fresh food evaporator
forward.
Slide the drain trough to the right and remove it
from under the evaporator.
3.
4.
5.
Recessed Screw
Drain Trough
Note:
When installing the drain trough, insure
trough outlet is inserted into the drain funnel.
(
Continued next page
)
CustomCool™
Inlet