background image

 

 

1.2.

 

Light-Emitting Diode Indicators (LEDs) 

Status Indicators 

LED 

LED State 

Operating State 

CPU OK

 

 

On Green 

CPU has passed its power-up diagnostics and is 

functioning properly. 

(After initialization sequence is 

complete.)

 

 

Off 

Power is not applied or CPU has a problem, which 

may be indicated by blink pattern. 

 

Blinking

 

Other 

LEDs off 

CPU in Stop-Halt state; possible watchdog timer 

fault. If the programmer cannot connect, cycle 

power with charged Energy Pack attached and refer 

to fault tables. 

CPU OK 

 

 

On Amber  CPU indicating CPU320/CRU320 compatibility setting 

FORCE 

 

 

On Amber  Refer to the section, 

Backward Compatibility with 

CPU320/CRU320/CPU315

 for more information. 

RUN

 

 

Blinking in 

unison 

CPU is updating an internal programmable hardware 

device. 

OUT EN 

 

RUN

 

 

On Green 

CPU is in Run mode.

 

 

Off 

CPU is in Stop mode. 

OUT EN

 

 

On Green 

Output scan is enabled. 

 

Off 

Output scan is disabled. 

FORCE

 

 

 

On Amber  Override is active on a bit reference. 

 

Off 

No Overrides active in I/O Reference Tables. 

RDSD 

 

On Green 

USB Device detected (No Activity) 

 

Blinking 

Green 

Port activity detected on USB Interface 

PACSystems* RX3i 1GHz 64MB CPU w/Ethernet Quick Start Guide 

GFK-2941E 

Содержание PACSystems* RX3i

Страница 1: ...GE s Automation Controls Programmable Control Products PACSystems RX3i 1GHz 64MB CPU w Ethernet IC695CPE330 Quick Start Guide GFK 2941E May 2016 g...

Страница 2: ...nding 10 3 Module Start up 11 3 1 You Will Need 11 3 2 Basic Installation Steps 11 3 3 Redundancy Configuration 12 3 4 PROFINET Controller Configuration 13 3 5 Backward Compatibility with CPU320 CRU32...

Страница 3: ...telligent Option modules up to 32K I O points RX3i Hot Standby Redundancy CPU with support for PROFINET I O using IC695PNC001 PROFINET Controllers RX3i Hot Standby Redundancy with Ethernet EGD Genius...

Страница 4: ...ty to transfer user programs and or data to and from USB 2 0 A type Removable Data Storage Devices RDSDs HART Pass Through allows the CPE330 to communicate HART asset management data between HART capa...

Страница 5: ...RDSD to CPU Run Stop Switch Position A three position switch which operates as follows CPU and Sweep Mode Memory Protection Run I O The CPU runs with I O sweep enabled User program memory is read onl...

Страница 6: ...fault tables CPU OK On Amber CPU indicating CPU320 CRU320 compatibility setting FORCE On Amber Refer to the section Backward Compatibility with CPU320 CRU320 CPU315 for more information RUN Blinking...

Страница 7: ...connection detected at corresponding port 1Gbps lower On Amber LAN1 or Corresponding network data speed is 1 Gbps On Green LAN2 Off Corresponding network data speed is 100 Mbps or 10 Mbps 1 3 Etherne...

Страница 8: ...th the PME programming software using the Service Request Transport Protocol SRTP a proprietary GE protocol used primarily for communication with the programmer To establish Ethernet communications be...

Страница 9: ...o independent LANs The dedicated LAN1 port will be used for communications with plant level or supervisory layers The switched LAN2 will typically be used to communicate with devices within the manufa...

Страница 10: ...ystem Verify that all components of the system have been received and that they agree with your order If the system received does not agree with your order contact Customer Care 2 2 Installation Locat...

Страница 11: ...MPONENTS MAY IMPAIR SUITABILITY FOR CLASS I DIVISION 2 WARNING EXPLOSION HAZARD WHEN IN HAZARDOUS AREAS TURN OFF POWER BEFORE REPLACING OR WIRING MODULES ATEX Zone 2 This module must be mounted in an...

Страница 12: ...on CPE330 operation refer to the PACSystems RX3i and RX7i CPU Reference Manual GFK 2222V or later 1 Turn power off at the RX3i rack and install the CPE330 in a double slot which is CPU compatible refe...

Страница 13: ...rack The two screws are located at the bottom rear of the CPU module Tighten 7 Apply power to the rack Note When the ACC402 Energy Pack is powered up a period of time is required to charge it up to i...

Страница 14: ...0 also serves as a drop in replacement for the CPU320 CRU320 and CPU315 Controllers without the need to upgrade PME To download projects intended for the CPU320 CRU320 to a CPE330 with versions of PME...

Страница 15: ...Red 4 To toggle the compatibility setting press the RDSD DNLD button The compatibility indication will toggle between the Normal CPU320 and CRU320 compatibility patterns each time the RDSD DNLD butto...

Страница 16: ...cation and storing the project to the CPE330 Note that CPE330s with firmware versions 8 45 through 8 60 support compatibility with the CPU320 and CPU315 only The compatibility setting using the RDSD b...

Страница 17: ...during initial installation Should the RTC battery fail the CPU date and time will be reset to 12 00 AM 01 01 2011 at start up The CPU operates normally with a failed or missing RTC battery however t...

Страница 18: ...erence Manual GFK 2950 PACSystems HART Pass Through User Manual GFK 2929 PACSystems Hot Standby CPU Redundancy User Manual GFK 2308 PACSystems RX3i PROFINET IO Controller User Manual GFK 2571 PROFINET...

Отзывы: