
Z Series RO System by GE Osmonics
4. Temperature
Alarm:
a. Connect the Temperature Alarm Monitor wires to the terminals in the RO
control box. Refer to the electrical schematic in Chapter Six for connections.
b. Install the Temperature Probe in the direct flow of the water in the run of a 1”
or larger piping tee after the first piece of pre-treatment equipment. Refer to
the installation drawing in Chapter Six for specific details.
5.
Storage Tank Level Controls:
a. Connect the Low Tank Level Switch to terminals TB3-7B and TB3-8B.
b. Connect the High Tank Level Switch to terminals TB3-9B and TB3-10B.
c. When the low level monitoring option is chosen with the RO Status Monitor
the dedicated float switch will connect to terminals TB3-4B and TB3-6B.
NOTE:
Operation of this unit without level switches (i.e. Direct Feed) requires a jumper to be
installed (typically installed at factory) between the float switch connection terminals
TB3-7B and TB3-8B.
1238339b – 16Oct03
2 - 5
Installation Guidelines and Instructions
Содержание Osmonics Z-10000
Страница 2: ......
Страница 6: ...This page intentionally left blank 1238339b D D 16 Oct 2003 ...
Страница 27: ...Z Series RO System by GE Osmonics NOTES 1238339b 16Oct03 1 21 General Information ...
Страница 28: ...Z Series RO System by GE Osmonics This page intentionally left blank 1238339b 16Oct03 1 22 General Information ...
Страница 37: ...Z Series RO System by GE Osmonics NOTES 1238339b 16Oct03 2 9 Installation Guidelines and Instructions ...
Страница 40: ...Z Series RO System by GE Osmonics This page intentionally left blank 1238339b 16Oct03 3 2 System Operation ...
Страница 43: ...Z Series RO System by GE Osmonics NOTES 1238339b 16Oct03 3 5 System Operation ...
Страница 44: ...Z Series RO System by GE Osmonics This page intentionally left blank 1238339b 16Oct03 3 6 System Operation ...
Страница 46: ...Z Series RO System by GE Osmonics This page intentionally left blank 1238339b 16Oct03 4 2 Routine Maintenance ...
Страница 72: ...Z Series RO System by GE Osmonics NOTES 1238339b 16Oct03 4 28 Routine Maintenance ...
Страница 74: ...Z Series RO System by GE Osmonics This page intentionally left blank 1238339b 16Oct03 5 2 Troubleshooting ...
Страница 76: ...Z Series RO System by GE Osmonics This page intentionally left blank 1238339b 16Oct03 5 4 Troubleshooting ...
Страница 84: ...Z Series RO System by GE Osmonics NOTES 1238339b 16Oct03 5 12 Troubleshooting ...
Страница 85: ...Z Series RO System by GE Osmonics Z Series RO System CHAPTER SIX DRAWINGS 1238339b 16Oct03 6 1 Drawings ...
Страница 86: ...Z Series RO System by GE Osmonics This page intentionally left blank 1238339b 16Oct03 6 2 Drawings ...
Страница 96: ...Z Series RO System by GE Osmonics 1238339b 16Oct03 6 12 Drawings Z Series RO Indirect Feed Flow Diagram ...
Страница 97: ...Z Series RO System by GE Osmonics 1238339b 16Oct03 6 13 Drawings Z Series RO Direct Feed Flow Diagram ...
Страница 101: ...Z Series RO System by GE Osmonics 1238339b 16Oct03 6 17 Drawings I O OFF ON Z Series RO Typical Controller ...
Страница 106: ...Z Series RO System by GE Osmonics Z Series RO Disinfect Alarm Monitor Wiring Connections 1238339b 16Oct03 6 22 Drawings ...
Страница 107: ...Z Series RO System by GE Osmonics 1238339b 16Oct03 6 23 Drawings Z Series RO Fluid Panel ...
Страница 110: ...Z Series RO System by GE Osmonics 1238339b 16Oct03 6 26 Drawings Z Series RO Waste Flow Control Valve Assembly ...
Страница 114: ...Z Series RO System by GE Osmonics Over Temperature Probe Probe Installation 1238339b 16Oct03 6 30 Drawings ...
Страница 119: ...Z Series RO System by GE Osmonics NOTES 1238339b 16Oct03 6 35 Drawings ...
Страница 120: ...Z Series RO System by GE Osmonics This page intentionally left blank 1238339b 16Oct03 6 36 Drawings ...
Страница 122: ...Z Series RO System by GE Osmonics This page intentionally left blank 1238339b 16Oct03 7 2 Spare Parts List ...
Страница 126: ...Z Series RO System by GE Osmonics NOTES 1238339b 16Oct03 7 6 Spare Parts List ...
Страница 127: ......