OEC 9800 Installation Procedure
10
Mechanical Checks
1.
Check the entire range of Wig-Wag movement.
2.
Check the entire range of Horizontal Cross-arm movement.
3.
Check the entire range of Flip-Flop/C-arm pivot.
4.
Check the entire range of C-arm orbital rotation.
5.
Check the entire range of L-arm rotation (N/A on Super C).
6.
Check the C-Arm Brake Pedal operation (forward lock, neutral and rear lock) positions.
7.
Check the entire range of C-Arm steering.
8.
Check the Workstation Brake Pedal operation (up, neutral, down) positions.
The Power Cord Assembly
There are two power cord assemblies. The two Power Cord assemblies are wired differently to accommodate the different
voltages. The correct power cord assembly must be used for proper operation of the system. One power cord assembly is used for
voltage sources ranging from 100 - 127 VAC and different power cord assembly is used for voltage sources ranging from 200 –
250 VAC.