CHAPTER 2: INSTALLATION
ELECTRICAL INSTALLATION
MM300 MOTOR MANAGEMENT SYSTEM – INSTRUCTION MANUAL
2–11
Figure 2-13: Core balance ground CT installation, shielded cable
POWER CABLE
TO MOTOR
TO STARTER
GROUND BUS
CABLE LUGS
TO SOURCE
TERMINATION
(TWISTED PAIR)
SPLIT-BOLT CONNECTOR
853712A1.CDR
CORE BALANCE CT
SECONDARY CONNECTION
TO MM300 IED
IMPORTANT: FOR SHIELDED
CABLE, THE GROUND WIRE
MUST PASS THROUGH THE
CT WINDOW.
50:0.025 CORE BALANCE CT
FOR GROUND SENSING
STRESS CONE
SHIELD GROUND
CONNECTION
BOTTOM OF
MOTOR STARTER
COMPARTMENT
Содержание Multilin MM300
Страница 20: ...1 14 MM300 MOTOR MANAGEMENT SYSTEM INSTRUCTION MANUAL SPECIFICATIONS CHAPTER 1 INTRODUCTION ...
Страница 104: ...3 44 MM300 MOTOR MANAGEMENT SYSTEM INSTRUCTION MANUAL SOFTWARE CHAPTER 3 INTERFACING WITH THE MM300 ...
Страница 184: ...6 8 MM300 MOTOR MANAGEMENT SYSTEM INSTRUCTION MANUAL COMMANDS CHAPTER 6 DIAGNOSTICS ...
Страница 192: ...8 2 MM300 MOTOR MANAGEMENT SYSTEM INSTRUCTION MANUAL COMMUNICATIONS INTERFACES CHAPTER 8 COMMUNICATIONS ...
Страница 198: ...A 6 MM300 MOTOR MANAGEMENT SYSTEM INSTRUCTION MANUAL REPAIRS CHAPTER A APPENDIX A ...