
8
CHECK INSTALLATION HARDWARE
Locate the hardware accessory box packed with the hood and check contents.
Installation Preparation
29-7/8"
11-1/2"
12"
27-3/4"
4 wood
screws
Discharge damper
Mounting bracket
2 stainless steel filters
3 Phillips head
screws to secure
electrical box to
top of motor
compartment
1 charcoal filter for
recirculating installations
2-piece decorative duct
cover (dimension shown
for reference only)
Air deflector for
recirculating
installations only
Duct bracket
“L” Brackets with hardware
package for cabinet-mounted
installations.
Contains 10 Phillips head screws
to secure the brackets to the
cabinet (8 required, 2 extra)
49-80270
07-04 JR
CUT OUT THIS PORTION
C
L
M
O
U
N
T
I
N
G
B
R
A
C
K
E
T
M
O
U
N
T
I
N
G
B
R
A
C
K
E
T
THIS EDGE
AGAINST
REAR WALL
THIS EDGE
AGAINST
REAR WALL
TOP CABINET TEMPLATE
Align template with centerline
and tape to bottom of the cabinet.
10-13/16"
11-3/4"
04302127
Cabinet installation template
REAR WALL TEMPLATE
C
L
49-80271
07-04 JR
Drill 1/8"
Pilot Holes
Drill 1/8"
Pilot Holes
Drill 1/8"
Pilot Holes
Drill 1/8"
Pilot Holes
Drill 1/8"
Pilot Holes
Drill 1/8"
Pilot Holes
ALIGN BOTTOM EDGE WITH
PENCIL LINE INDICATING
BOTTOM OF THE HOOD.
5-1/16"
9-5/8"
8-1/8"
2-1/16"
13-3/4"
12-3/4"
0
4
3
0
2
1
2
8
Wall mount template
4 wall
fasteners
4 Phillips head decorative
screws to secure duct cover
to ceiling bracket