
8
Installation Preparation
CleanSensor Dishwasher
• Hot water line may enter from either side,
from the rear, or from the floor within the
shaded area shown.
• Cut a hole approximately 1-1/2" in diam-
eter to admit water line.
• Install a hand shut-off valve in the supply
line in an accessible location, such as under
the sink. (The shut-off valve is optional, but
recommended and may be required by local
codes.)
When installing two dishwashers side-by-side,
route the water supply line as shown.
– Follow installation instructions for each
dishwasher.
• Water connection is on the left side of the
dishwasher. Install hot water line using no
less than 3/8" O.D. copper tubing or 1/2"
O.D. plastic tubing. Route water line as
shown and extend the line forward at least
19" from the rear wall.
• Allow at least 2" clearance between water
line and adjacent cabinet wall as shown.
• Before connecting, flush water line to clean
out debris.
Water
Supply
Double
Dishwashers
6"
5"
1-1/2" Dia.
Hole
5"
4"
19" from Wall
2" from Floor
Cabinet Face
2"
from
Cabinet
Hot
Shut-off
Valve
4"
1/2" O.D. Copper
Recommended To Here
Water Supply For 2-Dishwasher Installation
4"
5"
5"
5"
4" 5" 4"
6"
24"
Toe
Space
48" Min.
Cut Off Valve
Optional
Содержание Monogram ZBD3500
Страница 30: ...30 Notes ...
Страница 31: ...31 Notes ...