![GE MobileLink CB-1000 Скачать руководство пользователя страница 21](http://html.mh-extra.com/html/ge/mobilelink-cb-1000/mobilelink-cb-1000_installation-and-troubleshooting-manual_122986021.webp)
Revision D
MobileLink
17
2002783-060
Installation Procedures
Ensure that the flanges of the bracket assembly wrap around the
outer edges of the report tray as you slide the bracket assembly onto
the report tray.
Bracket Assembly Flanges & Report Tray
14. Push bracket assembly onto report tray until it stops and the screw
mounting hole appears in the larger hole of the report tray (see
below).
Alignment of Report Tray Hole and Screw Mounting Hole
15. Using the screw and washer provided, insert the screw into the screw
mounting hole on the bottom of the report tray and tighten with a
screwdriver.
16. Connect the cable labeled COM2 to the COM2 port on the back of
the MAC 5000.
20A
22A
Report tray hole
Screw mounting hole of
bracket assembly
Содержание MobileLink CB-1000
Страница 4: ...ii MobileLink Revision D 2002783 060 For your notes ...
Страница 39: ...Revision D MobileLink Index 1 2002783 060 Index ...
Страница 40: ...Index 2 MobileLink Revision D 2002783 060 For your notes ...
Страница 42: ...Index Index 4 MobileLink Revision D 2002783 060 ...
Страница 43: ......