CHAPTER 2 INSTALLATION
2-1 PRE-Installation
2-1-1 Overview
This section provides the information required to plan and prepare for the installation of
a LOGIQ A1. Included are descriptions of the facility and electrical needs to be met by
the purchaser of the unit.
2-1-2 Power line Requirements
Check the following wire’s parameters a week before installation. It is better to use
Drantez Model 605-3 power cord monitor with 101 options.
Parameter Rating
Power requirement
AC 220V
±
22V
Power consumption
No greater then 130VA
Power supply frequency
50Hz
Power supply twinkling change
Less than 25% of regular peak value, less
than1ms of any instant-change status,
including frequency
synchronization
asynchronism or non-seasonal status’s
change.
Attenuation surge
Less than 15% of peak value voltage, less
than 1ms.
2-1-3 Physical Specification
The weight of LOGIQ A1 is about 10Kg
Working Condition