Step 10 - Configure Controller per Galaxy Pulsar Edge Controller Quick Start Guide

 

1. Verify and edit controller basic configuration parameters per site engineering instructions. 
2. Con24V Alarm Input per site engineering instructions - see 

Information:  Controller - Configure Alarm Inputs and Outputs

3. Configure Converter Alarm Outputs per site engineering instructions - see 

Information:  Controller - Configure Alarm Inputs and Outputs

Step 8 - Install Converters

 

Firmly push the converter into the converter slot.  

Tighten the thumb screw until the converter is seated. 
NOTE:  When installing a converter in a powered system the RUN LED on the converter will 

blink until communication with the controller is established. 

Step 9 - Initial Start Up

 

Verify that all DC and Alarm connections are complete and secure.  

If there are no alarms, make required adjustments to the default settings on the controller for this installation. 

Information:  Controller - Configure Alarm Inputs and Outputs 

Converter Alarm Outputs: 

1. Select the 

Settings

 tab > Power > 

Converters 

to set alarm thresholds, severity and relays on J1 connector.  

2. Select the drop down arrow next to the LED field and select ALM to activate the ALM LED for that alarm 

condition.  

Factory defaults are shown in the web page to the right. 

Converter Alarm Outputs: 

Settings tab > Converters 

+24V Breaker Alarm Input: 

1. Select the 

Settings

 tab > Programming > Auxiliary Inputs 

Converters 

to configure the +24V Alarm 

Input.  

2. Select “Click to Edit Assoc. Alarm” select button to the right of J2.3. 
3. Select the drop down arrow next to the LED field and select ALM to activate the ALM LED for that 

alarm condition.  

4. Select the drop down arrow next to the Relay field and select ALM to activate the ALM Relay for 

that alarm condition.  

5. Edit the Descriptions as instructed. 
6. Select Submit to save. 
 
Factory defaults are shown in the web page to the right. 

Содержание J2007003L064

Страница 1: ...shelf for converter airflow Refer to Slimline Power System Brochure for details and accessories Quick Start Guide GE Critical Power SPS Stackable Slimline Converter Shelf Models J2007003L064 Step 1 Mount Shelf 1 Reposition mounting ears as required 4 screws each Torque to 25 in lb 2 8Nm Phillips screwdriver 2 Install Inter Shelf brackets between adjacent shelves optional Torque to 25 in lb 2 8Nm P...

Страница 2: ...d Shelf 4th Shelf Step 6 Connect Circuit Breaker Loads 1 Verify that breaker is OFF or not installed 2 Remove detachable terminal block 3 Insert load and load return wires Strip 0 4 in 10 mm 8 AWG 6 mm2 max 4 Torque to 6 5 in lb 0 75 Nm 5 Pull wires to verify 6 Insert detachable terminal block fully Detachable Terminal Block Screw Load Return 24V Load Wire Entry V V Step 7 Install Breakers Install...

Страница 3: ...ure If there are no alarms make required adjustments to the default settings on the controller for this installation Information Controller Configure Alarm Inputs and Outputs Converter Alarm Outputs 1 Select the Settings tab Power Converters to set alarm thresholds severity and relays on J1 connector 2 Select the drop down arrow next to the LED field and select ALM to activate the ALM LED for that...

Страница 4: ...tion Facilities OSP or where NEC applies Battery return may be either Isolated DC return DC I or Common DC return DC C Reference Documents These documents are available at www gecriticalpower com Document Title 850035894 Galaxy Pulsar Edge Quick Start Guide CC848815341 Pulsar Edge Controller Family Product Manual Slimline Power System Brochure 4 Parameter Range Default Converter Internal Selective...

Страница 5: ...ith electronic medical devices need to be aware that proximity to DC power and distribution systems including batteries and cables typically found in telecommunications utility rooms can affect medical electronic devices such as pacemakers Effects decrease with distance Safety Statements Do not install this equipment over combustible surfaces Rules and Regulations Follow all national and local rul...

Страница 6: ...SPS J2007003 L064 Quick Start Guide Document 850047442 r01 2015 July 2 Notes 6 ...

Страница 7: ...SPS J2007003 L064 Quick Start Guide Document 850047442 r01 2015 July 1 Notes 7 ...

Страница 8: ...uide Document 850047442 r01 2015 July 2 Notes 8 Document 850033855 r01 2013 August GE 601 Shiloh Rd Plano TX 75074 1 877 546 3243 Outside U S A 1 972 244 9288 www gecriticalpower com 2015 General Electric Company All rights reserved ...

Отзывы: